ITAC Assessment: TT0094
ITAC logo
ITAC Assessment: TT0094
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Blended Oils and Tomato Based Products
NAICS 311991: Perishable Prepared Food Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 166
Plant Area 200,000
ft2
Annual Production 75,700,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $640,429 6,673,117
kWh
Electricity Demand $53,178 25,441
kW-mo/yr
Natural Gas $299,065 47,592
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $97,871 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $9,034 - $9,034
95,300
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $742 - $742
7,827
kWh
-
03 2.7122: Disconnect ballasts $872 - $872
9,198
kWh
-
04 2.2522: Isolate hot or cold equipment $3,658 $150 $3,658
38,500
kWh
-
05 2.2135: Repair and eliminate steam leaks $12,041 $2,000 - $12,041
-
MMBtu
06 2.7447: Install vinyl strip / high speed / air curtain doors $2,111 $150 $2,111
21,453
kWh
-
07 2.7135: Install occupancy sensors $9,871 $2,250 $9,871
104,124
kWh
-
08 2.2614: Use cooling tower or economizer to replace chiller cooling $42,760 $8,000 $42,760
451,072
kWh
-
09 2.4224: Upgrade controls on compressors $2,473 $1,600 $2,473
26,086
kWh
-
10 2.4157: Establish a predictive maintenance program $10,016 $11,318 $10,016
105,652
kWh
-
11 2.7142: Utilize higher efficiency lamps and/or ballasts $254 $300 $254
2,680
kWh
-
12 2.7241: Install outside air damper / economizer on hvac unit $3,869 $4,800 $3,869
40,812
kWh
-
13 2.7425: Clean or color roof to reduce solar load $170 $411 $170
1,797
kWh
-
TOTAL RECOMMENDED $97,871 $30,979 $85,830
904,501
kWh
$12,041
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs