Assessment Year | 2000 |
---|---|
Principal Product | Disposable Razors |
NAICS |
n/a
|
SIC | 3421: Cutlery |
Sales Range | $50 M to 100M |
# of Employees | 176 |
Plant Area |
140,000
ft2
|
Annual Production | 1,700,000,000
pieces
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $370,802 | 11,412,661 |
kWh
|
$0.032 |
Electricity Demand | $211,861 | 21,459 |
kW-mo/yr
|
$9.87 |
Natural Gas | $6,567 | 951 |
MMBtu
|
$6.91 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $289,435 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings | Administrative Changes Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 4.421: Modify current incentive program | $80,000 | $16,690 | n/a | - | - | - | - | - | - | $80,000 | - |
02 | 3.5248: Separate and recycle scrap metal to foundry or for sale | $52,800 | $320 | n/a | - | - | - | - |
$52,800
-
lb
|
- | - | - |
03 | 2.4157: Establish a predictive maintenance program | $50,645 | $5,075 | n/a |
$42,440
1,326,202
kWh
|
- | - | - | - | - | - | $8,205 |
04 | 3.1191: Change procedures / equipment / operating conditions | $28,960 | $52,400 | n/a | - | - | - |
$28,960
-
gal
|
- | - | - | - |
05 | 2.3191: Use demand controller or load shedder | $26,200 | $18,500 | n/a | - |
$26,200
-
kW-mo/yr
|
- | - | - | - | - | - |
06 | 3.1191: Change procedures / equipment / operating conditions | $20,730 | $1,175 | n/a | - | - | - | - |
$20,730
-
lb
|
- | - | - |
07 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $15,015 | $21,850 | n/a |
$10,675
333,529
kWh
|
$4,340
-
kW-mo/yr
|
- | - | - | - | - | - |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $6,245 | - | n/a |
$4,210
131,594
kWh
|
$2,035
-
kW-mo/yr
|
- | - | - | - | - | - |
09 | 2.7447: Install vinyl strip / high speed / air curtain doors | $3,800 | $5,510 | n/a |
$3,650
84,115
kWh
|
- |
$150
-
MMBtu
|
- | - | - | - | - |
10 | 2.7144: Install spectral reflectors / delamp | $2,880 | $1,850 | n/a |
$1,595
48,066
kWh
|
$1,080
-
kW-mo/yr
|
- | - | - |
$205
-
lb
|
- | - |
11 | 2.7261: Install timers and/or thermostats | $2,160 | $2,820 | n/a |
$2,160
49,824
kWh
|
- | - | - | - | - | - | - |
TOTAL RECOMMENDED | $289,435 | $126,190 |
$64,730
1,973,330
kWh
|
$33,655
-
kW-mo/yr
|
$150
-
MMBtu
|
$28,960
-
gal
|
$73,530
-
lb
|
$205
-
lb
|
$80,000 | $8,205 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings | Administrative Changes Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs