ITAC Assessment: TN0597
ITAC logo
ITAC Assessment: TN0597
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Automotive safety air bag restraint assemblies
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $100
M
to 500
M
# of Employees 164
Plant Area 70,000
ft2
Annual Production 1,900,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $78,528 2,438,159
kWh
Electricity Demand $37,201 5,082
kW-mo/yr
Natural Gas $9,590 1,470
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $482,995 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $443,995

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings Primary Product Savings
01 4.453: Reschedule breaks to allow for continuous production $420,000 - - - - - - - - $420,000
02 2.6225: Eliminate third shift $35,200 $116,600 $14,600
487,691
kWh
- $2,100
-
MMBtu
- - $18,500 - -
03 2.7226: Use computer programs to optimize hvac performance $10,210 - $7,120
235,053
kWh
$3,090
-
kW-mo/yr
- - - - - -
04 2.7444: Close holes and openings in building such as broken windows $4,865 - $1,725
56,858
kWh
- $3,140
-
MMBtu
- - - - -
05 3.7131: Use a rag recycle service $3,800 - - - - - $4,700
-
lb
- $(-900.0) -
06 2.4231: Reduce the pressure of compressed air to the minimum required $2,710 $2,000 $1,550
51,290
kWh
$1,160
-
kW-mo/yr
- - - - - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,180 $800 $1,190
39,273
kWh
$990
-
kW-mo/yr
- - - - - -
08 2.7261: Install timers and/or thermostats $1,830 - $1,260
41,618
kWh
- $570
-
MMBtu
- - - - -
09 3.7211: Modify material application methods $1,560 $4,400 - - - $860
-
gal
- $450 $250 -
10 2.4221: Install compressor air intakes in coolest locations $640 $460 $350
11,723
kWh
$290
-
kW-mo/yr
- - - - - -
TOTAL RECOMMENDED $482,995 $124,260 $27,795
923,506
kWh
$5,530
-
kW-mo/yr
$5,810
-
MMBtu
$860
-
gal
$4,700
-
lb
$18,950 $(-650.0) $420,000
TOTAL IMPLEMENTED $443,995 $7,660 $13,195
435,815
kWh
$5,530
-
kW-mo/yr
$3,710
-
MMBtu
$860
-
gal
- $450 $250 $420,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs