ITAC Assessment: UU0085
ITAC logo
ITAC Assessment: UU0085
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product furniture
NAICS 337121: Upholstered Household Furniture Manufacturing
SIC 2512: Wood Household Furniture, Upholstered
Sales Range $50
M
to 100
M
# of Employees 750
Plant Area 673,000
ft2
Annual Production 405,000
pieces
Production Hrs. Annual 5,070
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $200,000 9,399,600
kWh
Electricity Demand $152,300 20,589
kW-mo/yr
Natural Gas $144,700 20,750
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,550 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,550 $1,110 $2,870
121,410
kWh
$2,680
-
kW-mo/yr
-
02 2.7221: Lower temperature during the winter season and vice-versa $3,960 $600 - - $3,960
-
MMBtu
03 2.4221: Install compressor air intakes in coolest locations $2,110 $405 $1,090
46,080
kWh
$1,020
-
kW-mo/yr
-
04 2.2414: Use waste heat from hot flue gases to preheat $3,090 $21,620 - - $3,090
-
MMBtu
05 2.1213: Direct warmest air to combustion intake $1,300 $940 - - $1,300
-
MMBtu
06 2.7447: Install vinyl strip / high speed / air curtain doors $390 $1,300 - - $390
-
MMBtu
07 2.2123: Insulate feedwater tank $150 $200 - - $150
-
MMBtu
TOTAL RECOMMENDED $16,550 $26,175 $3,960
167,490
kWh
$3,700
-
kW-mo/yr
$8,890
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs