Assessment Year | 2005 |
---|---|
Principal Product | furniture |
NAICS | 337121: Upholstered Household Furniture Manufacturing |
SIC | 2512: Wood Household Furniture, Upholstered |
Sales Range | $50 M to 100M |
# of Employees | 750 |
Plant Area |
673,000
ft2
|
Annual Production | 405,000
pieces
|
Production Hrs. Annual | 5,070
hrs
|
Location (State) | Utah |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $200,000 | 9,399,600 |
kWh
|
$0.021 |
Electricity Demand | $152,300 | 20,589 |
kW-mo/yr
|
$7.40 |
Natural Gas | $144,700 | 20,750 |
MMBtu
|
$6.97 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $16,550 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,550 | $1,110 |
$2,870
121,410
kWh
|
$2,680
-
kW-mo/yr
|
- | |
02 | 2.7221: Lower temperature during the winter season and vice-versa | $3,960 | $600 | - | - |
$3,960
-
MMBtu
|
|
03 | 2.4221: Install compressor air intakes in coolest locations | $2,110 | $405 |
$1,090
46,080
kWh
|
$1,020
-
kW-mo/yr
|
- | |
04 | 2.2414: Use waste heat from hot flue gases to preheat | $3,090 | $21,620 | - | - |
$3,090
-
MMBtu
|
|
05 | 2.1213: Direct warmest air to combustion intake | $1,300 | $940 | - | - |
$1,300
-
MMBtu
|
|
06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $390 | $1,300 | - | - |
$390
-
MMBtu
|
|
07 | 2.2123: Insulate feedwater tank | $150 | $200 | - | - |
$150
-
MMBtu
|
|
TOTAL RECOMMENDED | $16,550 | $26,175 |
$3,960
167,490
kWh
|
$3,700
-
kW-mo/yr
|
$8,890
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs