Assessment Year | 2017 |
---|---|
Principal Product | Wine |
NAICS | 312130: Wineries |
SIC | 2084: Wines, Brandy, and Brandy Spirits |
Sales Range | $100 M to 500M |
# of Employees | 91 |
Plant Area |
276,287
ft2
|
Annual Production | 6,000
Tgal
|
Production Hrs. Annual | 3,480
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $371,192 | 3,511,307 |
kWh
|
$0.11 |
Electricity Demand | $179,755 | 5,832 |
kW-mo/yr
|
$30.82 |
Natural Gas | $46,574 | 4,654 |
MMBtu
|
$10.01 |
TOTAL YEARLY COSTS | $597,521 | |||
RECOMMENDED SAVINGS* | $136,581 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $80,854 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7496: Install partitions to reduce size of conditioned space | $2,452 | - |
$1,492
14,115
kWh
|
- |
$960
-
MMBtu
|
- | - | |
02 | 2.5195: Change product design to reduce energy requirements | $6,821 | - |
$6,821
64,522
kWh
|
- | - | - | - | |
03 | 2.7261: Install timers and/or thermostats | $17,732 | $2,539 |
$3,514
33,246
kWh
|
- |
$14,218
-
MMBtu
|
- | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $596 | $140 |
$249
2,354
kWh
|
$347
-
kW-mo/yr
|
- | - | - | |
05 | 2.6231: Utilize controls to operate equipment only when needed | $11,813 | $10,550 |
$11,813
99,374
kWh
|
- | - | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $38,416 | $53,848 |
$18,520
175,200
kWh
|
$15,019
-
kW-mo/yr
|
- | $5,259 | $(-382.0) | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $12,893 | $42,428 |
$12,893
121,962
kWh
|
- | - | - | - | |
08 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $7,625 | $31,216 |
$6,204
58,689
kWh
|
$3,233
-
kW-mo/yr
|
$(-1,812.0)
-
MMBtu
|
- | - | |
09 | 4.212: Adopt in-house material generation | $38,233 | $90,166 |
$(-3,898.0)
(-36,874)
kWh
|
$(-4,962.0)
-
kW-mo/yr
|
- | - | $47,093 | |
TOTAL RECOMMENDED | $136,581 | $230,887 |
$57,608
532,588
kWh
|
$13,637
-
kW-mo/yr
|
$13,366
-
MMBtu
|
$5,259 | $46,711 | ||
TOTAL IMPLEMENTED | $80,854 | $109,365 |
$46,740
429,782
kWh
|
$15,019
-
kW-mo/yr
|
$14,218
-
MMBtu
|
$5,259 | $(-382.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs