ITAC Assessment: TN0512
ITAC logo
ITAC Assessment: TN0512
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Automobile steel tubing
NAICS
n/a
SIC 3498: Fabricated Pipe and Pipe Fittings
Sales Range $10
M
to 50
M
# of Employees 184
Plant Area 53,000
ft2
Annual Production 2,500,000
pieces
Production Hrs. Annual 7,650
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $111,480 2,091,735
kWh
Natural Gas $9,973 1,302
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,255 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,901

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,901 $840 $8,901
167,937
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $4,241 $620 $4,241
79,719
kWh
-
03 2.4314: Use synthetic lubricant $3,076 - $3,076
58,030
kWh
-
04 2.7261: Install timers and/or thermostats $997 $1,100 $419
7,913
kWh
$578
-
MMBtu
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $450 $280 $450
8,499
kWh
-
06 2.3212: Optimize plant power factor $5,590 $6,000 $5,590
-
kWh
-
TOTAL RECOMMENDED $23,255 $8,840 $22,677
322,098
kWh
$578
-
MMBtu
TOTAL IMPLEMENTED $8,901 $840 $8,901
167,937
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs