ITAC Assessment: MZ0070
ITAC logo
ITAC Assessment: MZ0070
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Aluminum castings
NAICS 332710: Machine Shops
SIC 3334: Primary Production of Aluminum
Sales Range $10
M
to 50
M
# of Employees 53
Plant Area 72,000
ft2
Annual Production 36,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $271,690 3,377,939
kWh
Electricity Demand $28,277 13,626
kW-mo/yr
Natural Gas $134,306 25,564
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $69,115 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $47,749

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $1,076 $800 - - $1,076
-
MMBtu
02 2.4221: Install compressor air intakes in coolest locations $2,693 $920 $2,693
33,674
kWh
- -
03 2.4322: Use or replace with energy efficient substitutes $1,071 $1,122 $1,071
14,160
kWh
- -
04 2.7492: Use proper thickness of insulation on building envelope $2,769 $360 - - $2,769
-
MMBtu
05 2.2437: Recover waste heat from equipment $40,140 $10,000 - - $40,140
-
MMBtu
06 2.7111: Reduce illumination to minimum necessary levels $209 $200 $192
2,400
kWh
$17
-
kW-mo/yr
-
07 2.7243: Improve air circulation with destratification fans / other methods $21,157 $16,730 - - $21,157
-
MMBtu
TOTAL RECOMMENDED $69,115 $30,132 $3,956
50,234
kWh
$17
-
kW-mo/yr
$65,143
-
MMBtu
TOTAL IMPLEMENTED $47,749 $13,202 $3,764
47,834
kWh
- $43,986
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs