| Assessment Year | 2011 |
|---|---|
| Principal Product | Aluminum castings |
| NAICS | 332710: Machine Shops |
| SIC | 3334: Primary Production of Aluminum |
| Sales Range | $10 M to 50M |
| # of Employees | 53 |
| Plant Area |
72,000
ft2
|
| Annual Production | 36,000
pieces
|
| Production Hrs. Annual | 4,000
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $271,690 | 3,377,939 |
kWh
|
$0.080 |
| Electricity Demand | $28,277 | 13,626 |
kW-mo/yr
|
$2.08 |
| Natural Gas | $134,306 | 25,564 |
MMBtu
|
$5.25 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $69,115 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $47,749 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2437: Recover waste heat from equipment | $1,076 | $800 | - | - |
$1,076
-
MMBtu
|
|
| 02 | 2.4221: Install compressor air intakes in coolest locations | $2,693 | $920 |
$2,693
33,674
kWh
|
- | - | |
| 03 | 2.4322: Use or replace with energy efficient substitutes | $1,071 | $1,122 |
$1,071
14,160
kWh
|
- | - | |
| 04 | 2.7492: Use proper thickness of insulation on building envelope | $2,769 | $360 | - | - |
$2,769
-
MMBtu
|
|
| 05 | 2.2437: Recover waste heat from equipment | $40,140 | $10,000 | - | - |
$40,140
-
MMBtu
|
|
| 06 | 2.7111: Reduce illumination to minimum necessary levels | $209 | $200 |
$192
2,400
kWh
|
$17
-
kW-mo/yr
|
- | |
| 07 | 2.7243: Improve air circulation with destratification fans / other methods | $21,157 | $16,730 | - | - |
$21,157
-
MMBtu
|
|
| TOTAL RECOMMENDED | $69,115 | $30,132 |
$3,956
50,234
kWh
|
$17
-
kW-mo/yr
|
$65,143
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $47,749 | $13,202 |
$3,764
47,834
kWh
|
- |
$43,986
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs