ITAC Assessment: UC2512
ITAC logo
ITAC Assessment: UC2512
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Telecom cables
NAICS 334210: Telephone Apparatus Manufacturing
SIC 3643: Current-Carrying Wiring Devices
Sales Range $100
M
to 500
M
# of Employees 200
Plant Area 248,000
ft2
Annual Production 7,200,000
units
Production Hrs. Annual 2,080
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $376,028 3,367,022
kWh
Electricity Demand $215,802 10,534
kW-mo/yr
Electricity Fees $4,866 -
Natural Gas $31,302 2,136
MMBtu
TOTAL YEARLY COSTS $627,998
RECOMMENDED SAVINGS* $48,432 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $19,815 $143,127 $3,256
29,602
kWh
$1,999
-
kW-mo/yr
$14,560
02 2.4322: Use or replace with energy efficient substitutes $3,537 $30,000 $534
4,857
kWh
$628
-
kW-mo/yr
$2,375
03 2.4221: Install compressor air intakes in coolest locations $2,813 $2,200 $2,442
22,196
kWh
$372
-
kW-mo/yr
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $18,345 $300 $14,431
131,187
kWh
$3,914
-
kW-mo/yr
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,912 $2,380 $2,424
22,040
kWh
$488
-
kW-mo/yr
-
06 4.611: Begin a practice of predictive / preventative maintenance $1,009 $840 $1,009
9,175
kWh
- -
TOTAL RECOMMENDED $48,432 $178,847 $24,096
219,057
kWh
$7,401
-
kW-mo/yr
$16,935
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs