Assessment Year | 2025 |
---|---|
Principal Product | Telecom cables |
NAICS | 334210: Telephone Apparatus Manufacturing |
SIC | 3643: Current-Carrying Wiring Devices |
Sales Range | $100 M to 500M |
# of Employees | 200 |
Plant Area |
248,000
ft2
|
Annual Production | 7,200,000
units
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Connecticut |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $376,028 | 3,367,022 |
kWh
|
$0.11 |
Electricity Demand | $215,802 | 10,534 |
kW-mo/yr
|
$20.49 |
Electricity Fees | $4,866 | - |
|
- |
Natural Gas | $31,302 | 2,136 |
MMBtu
|
$14.65 |
TOTAL YEARLY COSTS | $627,998 | |||
RECOMMENDED SAVINGS* | $48,432 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $19,815 | $143,127 |
$3,256
29,602
kWh
|
$1,999
-
kW-mo/yr
|
$14,560 | |
02 | 2.4322: Use or replace with energy efficient substitutes | $3,537 | $30,000 |
$534
4,857
kWh
|
$628
-
kW-mo/yr
|
$2,375 | |
03 | 2.4221: Install compressor air intakes in coolest locations | $2,813 | $2,200 |
$2,442
22,196
kWh
|
$372
-
kW-mo/yr
|
- | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $18,345 | $300 |
$14,431
131,187
kWh
|
$3,914
-
kW-mo/yr
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,912 | $2,380 |
$2,424
22,040
kWh
|
$488
-
kW-mo/yr
|
- | |
06 | 4.611: Begin a practice of predictive / preventative maintenance | $1,009 | $840 |
$1,009
9,175
kWh
|
- | - | |
TOTAL RECOMMENDED | $48,432 | $178,847 |
$24,096
219,057
kWh
|
$7,401
-
kW-mo/yr
|
$16,935 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs