ITAC Assessment: TN0445
ITAC logo
ITAC Assessment: TN0445
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product LIGHTING ASSEMBLIES
NAICS
n/a
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $5
M
to 10
M
# of Employees 115
Plant Area
n/a
Annual Production 70,000,000
pieces
Production Hrs. Annual 4,420
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $28,501 337,339
kWh
LPG $23,479 2,758
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,234 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,234

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $3,139 - $3,139
36,928
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,965 - $2,965
34,877
kWh
-
03 2.7123: Keep lamps and reflectors clean $3,030 $3,024 $3,030
33,411
kWh
-
04 2.7261: Install timers and/or thermostats $647 $240 - $647
-
MMBtu
05 2.2511: Insulate bare equipment $947 $247 $947
11,137
kWh
-
06 2.7123: Keep lamps and reflectors clean $221 $660 - $221
-
MMBtu
07 2.6232: Install set-back timers $573 - $573
6,741
kWh
-
08 2.4221: Install compressor air intakes in coolest locations $548 $495 $548
6,448
kWh
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $1,164 $369 $1,164
13,775
kWh
-
TOTAL RECOMMENDED $13,234 $5,035 $12,366
143,317
kWh
$868
-
MMBtu
TOTAL IMPLEMENTED $13,234 $5,035 $12,366
143,317
kWh
$868
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs