ITAC Assessment: TN0428
ITAC logo
ITAC Assessment: TN0428
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product DIMENSIONAL HARDWARE
NAICS
n/a
SIC 2426: Hardwood Dimension and Flooring Mills
Sales Range $10
M
to 50
M
# of Employees 153
Plant Area
n/a
Annual Production 14,700,000
lb
Production Hrs. Annual 4,410
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $268,168 5,834,408
kWh
Natural Gas $6,667 1,498
MMBtu
Wood $194,000 252,000
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $247,374 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Wood Savings Administrative Changes Savings
01 2.1335: Replace gasoline with diesel, lpg, or natural gas $217,463 - $222,313
4,837,632
kWh
- $(-4,850.0)
-
MMBtu
-
02 2.2136: Install / repair insulation on steam lines $361 $984 - $105
-
MMBtu
$256
-
MMBtu
-
03 2.6232: Install set-back timers $11,136 - $11,136
242,087
kWh
- - -
04 2.7123: Keep lamps and reflectors clean $8,847 - $8,251
179,367
kWh
- - $596
05 2.2122: Install / repair insulation on condensate lines $73 $75 - $21
-
MMBtu
$52
-
MMBtu
-
06 2.7444: Close holes and openings in building such as broken windows $2,021 $500 - $2,021
-
MMBtu
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $742 $510 $742
16,120
kWh
- - -
08 2.4312: Improve lubrication practices $634 $2,100 $634
13,775
kWh
- - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $1,578 $451 $1,578
34,291
kWh
- - -
10 2.4221: Install compressor air intakes in coolest locations $607 $660 $607
13,189
kWh
- - -
11 2.3212: Optimize plant power factor $3,912 $5,900 $3,912
-
kWh
- - -
TOTAL RECOMMENDED $247,374 $11,180 $249,173
5,336,461
kWh
$2,147
-
MMBtu
$(-4,542.0)
-
MMBtu
$596
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Wood Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs