Assessment Year | 1990 |
---|---|
Principal Product | HARDWOOD STRIP FLOORING |
NAICS |
n/a
|
SIC | 2426: Hardwood Dimension and Flooring Mills |
Sales Range | $5 M to 10M |
# of Employees | 104 |
Plant Area |
n/a
|
Annual Production | 7,500
thousand feet
|
Production Hrs. Annual | 2,168
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $373,454 | 6,600,235 |
kWh
|
$0.057 |
Wood | $112,000 | 137,600 |
MMBtu
|
$0.81 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $314,706 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $45,154 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Wood Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.3412: Use waste heat to produce steam to drive a steam turbine-generator | $258,435 | - |
$258,435
4,582,356
kWh
|
- | - | |
02 | 2.2136: Install / repair insulation on steam lines | $5,052 | $9,401 | - |
$5,052
-
MMBtu
|
- | |
03 | 2.2135: Repair and eliminate steam leaks | $2,222 | $4,000 | - |
$2,222
-
MMBtu
|
- | |
04 | 2.6232: Install set-back timers | $12,329 | - |
$12,329
216,295
kWh
|
- | - | |
05 | 2.2122: Install / repair insulation on condensate lines | $524 | $2,000 | - |
$524
-
MMBtu
|
- | |
06 | 2.6122: Adjust vents to minimize energy use | $10,842 | $4,670 |
$10,842
190,211
kWh
|
- | - | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $10,374 | $1,000 |
$10,374
182,005
kWh
|
- | - | |
08 | 2.7123: Keep lamps and reflectors clean | $6,631 | $9,913 |
$6,251
108,441
kWh
|
- | $380 | |
09 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,692 | $2,250 |
$3,692
64,771
kWh
|
- | - | |
10 | 2.7261: Install timers and/or thermostats | $2,859 | $760 |
$2,859
42,204
kWh
|
- | - | |
11 | 2.4221: Install compressor air intakes in coolest locations | $952 | $490 |
$952
16,706
kWh
|
- | - | |
12 | 2.6211: Conserve energy by efficient use of vending machines | $451 | $1,740 |
$451
7,913
kWh
|
- | - | |
13 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $343 | $289 |
$343
5,862
kWh
|
- | - | |
TOTAL RECOMMENDED | $314,706 | $36,513 |
$306,528
5,416,764
kWh
|
$7,798
-
MMBtu
|
$380 | ||
TOTAL IMPLEMENTED | $45,154 | $22,321 |
$37,356
647,421
kWh
|
$7,798
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Wood Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs