ITAC Assessment: TN0385
ITAC logo
ITAC Assessment: TN0385
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product FROZEN DOUGH,BAKED GOODS
NAICS
n/a
SIC 2045: Prepared Flour Mixes and Doughs
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area
n/a
Annual Production 100,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $754,063 15,238,863
kWh
Natural Gas $130,863 36,740
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,443 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,299

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7261: Install timers and/or thermostats $4,216 $560 $1,034
21,102
kWh
$3,182
-
MMBtu
-
02 2.2511: Insulate bare equipment $3,071 $2,300 - $3,071
-
MMBtu
-
03 2.7123: Keep lamps and reflectors clean $8,857 $10,432 $8,444
172,333
kWh
- $413
04 2.7447: Install vinyl strip / high speed / air curtain doors $7,224 $10,400 $7,224
147,421
kWh
- -
05 2.2135: Repair and eliminate steam leaks $1,210 $380 - $1,210
-
MMBtu
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,251 $270 $4,251
86,753
kWh
- -
07 2.6232: Install set-back timers $3,648 - $3,648
74,443
kWh
- -
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,449 - $1,449
29,308
kWh
- -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $517 $301 $517
10,551
kWh
- -
TOTAL RECOMMENDED $34,443 $24,643 $26,567
541,911
kWh
$7,463
-
MMBtu
$413
TOTAL IMPLEMENTED $18,299 $11,351 $17,089
348,476
kWh
$1,210
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs