ITAC Assessment: TN0382
ITAC logo
ITAC Assessment: TN0382
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product MILITARY TYPE FURNITURE
NAICS
n/a
SIC 2531: Public Building and Related Furniture
Sales Range $1
M
to 5
M
# of Employees 90
Plant Area
n/a
Annual Production 12,000
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $75,642 1,131,887
kWh
Fuel Oil #2 $26,078 5,922
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,329 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,562

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $2,396 $600 $2,396
35,756
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,767 $300 $1,767
26,377
kWh
-
03 2.2511: Insulate bare equipment $394 $1,154 - $394
-
MMBtu
04 2.7261: Install timers and/or thermostats $1,354 - $1,354
20,223
kWh
-
05 2.2437: Recover waste heat from equipment $438 $1,850 $255
3,810
kWh
$183
-
MMBtu
06 2.6232: Install set-back timers $707 - $707
10,551
kWh
-
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $530 $1,250 $530
7,913
kWh
-
08 2.2531: Re-size charging openings or add movable cover or door $115 $600 - $115
-
MMBtu
09 2.7142: Utilize higher efficiency lamps and/or ballasts $354 $900 $354
10,551
kWh
-
10 2.7122: Disconnect ballasts $137 $221 $137
2,052
kWh
-
11 2.4221: Install compressor air intakes in coolest locations $137 $490 $137
2,052
kWh
-
TOTAL RECOMMENDED $8,329 $7,365 $7,637
119,285
kWh
$692
-
MMBtu
TOTAL IMPLEMENTED $6,562 $7,065 $5,870
92,908
kWh
$692
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs