ITAC Assessment: TN0361
ITAC logo
ITAC Assessment: TN0361
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product HAMMERS,CHISELS,PYLIERS
NAICS
n/a
SIC 3423: Hand and Edge Tools, Except Machine Tools and Handsaws
Sales Range $10
M
to 50
M
# of Employees 279
Plant Area
n/a
Annual Production 6,700,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $780,428 13,597,011
kWh
Natural Gas $86,503 22,277
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $102,303 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $59,738

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6122: Adjust vents to minimize energy use $30,604 $6,500 $30,604
536,928
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $13,381 $1,110 $13,381
234,760
kWh
-
03 2.7231: Use radiant heater for spot heating $2,488 $5,550 - $2,488
-
MMBtu
04 2.2191: Substitute hot process fluids for steam $1,833 $3,650 - $1,833
-
MMBtu
05 2.6232: Install set-back timers $7,384 - $7,384
129,543
kWh
-
06 2.2511: Insulate bare equipment $2,222 $548 $2,222
38,980
kWh
-
07 2.7261: Install timers and/or thermostats $2,339 $680 $2,339
41,032
kWh
-
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,021 - $2,021
35,463
kWh
-
09 2.7243: Improve air circulation with destratification fans / other methods $188 $1,750 - $188
-
MMBtu
10 2.4221: Install compressor air intakes in coolest locations $1,587 $780 $1,587
27,843
kWh
-
11 2.2122: Install / repair insulation on condensate lines $82 $50 - $82
-
MMBtu
12 2.2511: Insulate bare equipment $334 $247 $334
5,862
kWh
-
13 2.3212: Optimize plant power factor $37,840 $35,000 $37,840
-
kWh
-
TOTAL RECOMMENDED $102,303 $55,865 $97,712
1,050,411
kWh
$4,591
-
MMBtu
TOTAL IMPLEMENTED $59,738 $43,170 $57,168
339,098
kWh
$2,570
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs