ITAC Assessment: NC0111
ITAC logo
ITAC Assessment: NC0111
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product animal protein adhesives
NAICS
n/a
SIC 2891: Adhesives and Sealants
Sales Range $10
M
to 50
M
# of Employees 31
Plant Area 55,000
ft2
Annual Production 20,000,000
lb
Production Hrs. Annual 4,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $36,469 1,063,599
kWh
Electricity Demand $40,508 4,403
kW-mo/yr
Natural Gas $22,402 3,874
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $100,781 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,927

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings Primary Product Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $21,132 $6,877 $18,522
540,152
kWh
$15,898
-
kW-mo/yr
$(-13,288.0)
-
MMBtu
- - -
02 2.2515: Use optimum thickness insulation $245 $233 - - $245
-
MMBtu
- - -
03 2.4133: Use most efficient type of electric motors $83 $94 $37
1,172
kWh
$46
-
kW-mo/yr
- - - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $555 $55 $438
12,896
kWh
$117
-
kW-mo/yr
- - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $337 $986 $129
3,810
kWh
$208
-
kW-mo/yr
- - - -
06 2.7135: Install occupancy sensors $140 $125 $140
4,103
kWh
- - - - -
07 3.5315: Lease / purchase baler; sell cardboard to recycler $2,289 $5,200 - - - $3,289
-
lb
$(-1,000.0) -
08 4.111: Add equipment/ operators to reduce production bottleneck $76,000 - - - - - - $76,000
TOTAL RECOMMENDED $100,781 $13,570 $19,266
562,133
kWh
$16,269
-
kW-mo/yr
$(-13,043.0)
-
MMBtu
$3,289
-
lb
$(-1,000.0) $76,000
TOTAL IMPLEMENTED $2,927 $5,349 $475
14,068
kWh
$163
-
kW-mo/yr
- $3,289
-
lb
$(-1,000.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs