| Assessment Year | 1997 |
|---|---|
| Principal Product | animal protein adhesives |
| NAICS |
n/a
|
| SIC | 2891: Adhesives and Sealants |
| Sales Range | $10 M to 50M |
| # of Employees | 31 |
| Plant Area |
55,000
ft2
|
| Annual Production | 20,000,000
lb
|
| Production Hrs. Annual | 4,000
hrs
|
| Location (State) | North Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $36,469 | 1,063,599 |
kWh
|
$0.034 |
| Electricity Demand | $40,508 | 4,403 |
kW-mo/yr
|
$9.20 |
| Natural Gas | $22,402 | 3,874 |
MMBtu
|
$5.78 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $100,781 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $2,927 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Ancillary Material Cost Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $21,132 | $6,877 |
$18,522
540,152
kWh
|
$15,898
-
kW-mo/yr
|
$(-13,288.0)
-
MMBtu
|
- | - | - | |
| 02 | 2.2515: Use optimum thickness insulation | $245 | $233 | - | - |
$245
-
MMBtu
|
- | - | - | |
| 03 | 2.4133: Use most efficient type of electric motors | $83 | $94 |
$37
1,172
kWh
|
$46
-
kW-mo/yr
|
- | - | - | - | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $555 | $55 |
$438
12,896
kWh
|
$117
-
kW-mo/yr
|
- | - | - | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $337 | $986 |
$129
3,810
kWh
|
$208
-
kW-mo/yr
|
- | - | - | - | |
| 06 | 2.7135: Install occupancy sensors | $140 | $125 |
$140
4,103
kWh
|
- | - | - | - | - | |
| 07 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $2,289 | $5,200 | - | - | - |
$3,289
-
lb
|
$(-1,000.0) | - | |
| 08 | 4.111: Add equipment/ operators to reduce production bottleneck | $76,000 | - | - | - | - | - | - | $76,000 | |
| TOTAL RECOMMENDED | $100,781 | $13,570 |
$19,266
562,133
kWh
|
$16,269
-
kW-mo/yr
|
$(-13,043.0)
-
MMBtu
|
$3,289
-
lb
|
$(-1,000.0) | $76,000 | ||
| TOTAL IMPLEMENTED | $2,927 | $5,349 |
$475
14,068
kWh
|
$163
-
kW-mo/yr
|
- |
$3,289
-
lb
|
$(-1,000.0) | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Ancillary Material Cost Savings | Primary Product Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs