Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product CERAMIC FIBERS
NAICS
n/a
SIC 3299: Nonmetallic Mineral Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 143
Plant Area
n/a
Annual Production 5,000
ton
Production Hrs. Annual 8,064
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $925,747 19,987,105
kWh
Natural Gas $145,399 31,304
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,527 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,600

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7261: Install timers and/or thermostats $7,348 $1,020 $7,348
159,730
kWh
-
02 2.4227: Use compressor air filters $5,608 $100 $5,608
121,923
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,880 $1,000 $4,880
106,096
kWh
-
04 2.2437: Recover waste heat from equipment $1,687 $2,170 - $1,687
-
MMBtu
05 2.6124: Establish equipment maintenance schedule $1,001 - - $1,001
-
MMBtu
06 2.6232: Install set-back timers $1,550 - $1,550
33,705
kWh
-
07 2.7121: Utilize daylight whenever possible in lieu of artificial light $1,240 $6,161 $1,240
26,964
kWh
-
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $485 $120 $485
10,551
kWh
-
09 2.7123: Keep lamps and reflectors clean $418 $1,230 $418
9,086
kWh
-
10 2.7142: Utilize higher efficiency lamps and/or ballasts $310 $621 $310
6,741
kWh
-
TOTAL RECOMMENDED $24,527 $12,422 $21,839
474,796
kWh
$2,688
-
MMBtu
TOTAL IMPLEMENTED $21,600 $4,091 $20,599
447,832
kWh
$1,001
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs