Assessment Year | 1984 |
---|---|
Principal Product | STAINLESS STEEL PIPE |
NAICS |
n/a
|
SIC | 3498: Fabricated Pipe and Pipe Fittings |
Sales Range | $10 M to 50M |
# of Employees | 300 |
Plant Area |
n/a
|
Annual Production | 1,000
thousand feet
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $232,086 | 3,832,943 |
kWh
|
$0.061 |
Natural Gas | $177,946 | 31,365 |
MMBtu
|
$5.67 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $38,525 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $33,496 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2514: Cover open tanks | $10,482 | $3,500 | - |
$10,482
-
MMBtu
|
|
02 | 2.7261: Install timers and/or thermostats | $12,107 | $1,000 | - |
$12,107
-
MMBtu
|
|
03 | 2.2136: Install / repair insulation on steam lines | $2,092 | $300 | - |
$2,092
-
MMBtu
|
|
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,311 | $175 |
$5,311
88,511
kWh
|
- | |
05 | 2.5123: Reduce fluid flow rates | $5,029 | $1,680 |
$5,029
83,822
kWh
|
- | |
06 | 2.6232: Install set-back timers | $3,077 | - |
$3,077
51,290
kWh
|
- | |
07 | 2.2163: Use minimum steam operating pressure | $427 | - | - |
$427
-
MMBtu
|
|
TOTAL RECOMMENDED | $38,525 | $6,655 |
$13,417
223,623
kWh
|
$25,108
-
MMBtu
|
||
TOTAL IMPLEMENTED | $33,496 | $4,975 |
$8,388
139,801
kWh
|
$25,108
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs