ITAC Assessment: SU0132
ITAC logo
ITAC Assessment: SU0132
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product gaskets, sealing products
NAICS
n/a
SIC 3053: Gaskets, Packing, and Sealing Devices
Sales Range $5
M
to 10
M
# of Employees 60
Plant Area 57,470
ft2
Annual Production 0
units
Production Hrs. Annual 3,120
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $19,702 388,938
kWh
Electricity Demand $17,722 1,518
kW-mo/yr
Electricity Fees $1,552 -
Natural Gas $12,400 1,307
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,186 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,294

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.2515: Use optimum thickness insulation $1,746 - - - $1,746
-
MMBtu
-
02 2.7111: Reduce illumination to minimum necessary levels $6,727 $8,057 $3,494
71,885
kWh
$3,233
-
kW-mo/yr
- -
03 2.7261: Install timers and/or thermostats $5,704 $472 $2,430
48,593
kWh
- $3,274
-
MMBtu
-
04 4.514: Re-arrange equipment layout to reduce handling costs $5,586 $392 - - - $5,586
05 2.7124: Make a practice of turning off lights when not needed $1,123 - $1,123
22,464
kWh
- - -
06 2.7447: Install vinyl strip / high speed / air curtain doors $451 $809 - - $451
-
MMBtu
-
07 2.7447: Install vinyl strip / high speed / air curtain doors $357 $40 - - $357
-
MMBtu
-
08 2.2437: Recover waste heat from equipment $290 $107 - - $290
-
MMBtu
-
09 2.4231: Reduce the pressure of compressed air to the minimum required $154 - $154
3,080
kWh
- - -
10 2.4221: Install compressor air intakes in coolest locations $48 $79 $48
995
kWh
- - -
TOTAL RECOMMENDED $22,186 $9,956 $7,249
147,017
kWh
$3,233
-
kW-mo/yr
$6,118
-
MMBtu
$5,586
TOTAL IMPLEMENTED $19,294 $8,921 $7,201
146,022
kWh
$3,233
-
kW-mo/yr
$3,274
-
MMBtu
$5,586
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs