Assessment Year | 1985 |
---|---|
Principal Product | CUSTOM MOLDED RUBBER PDT |
NAICS |
n/a
|
SIC | 3069: Fabricated Rubber Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 230 |
Plant Area |
n/a
|
Annual Production | 300,000
lb
|
Production Hrs. Annual | 2,925
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $206,163 | 1,737,104 |
kWh
|
$0.12 |
Natural Gas | $19,873 | 3,805 |
MMBtu
|
$5.22 |
Fuel Oil #2 | $166,684 | 26,040 |
MMBtu
|
$6.40 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $74,861 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $51,769 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,017 | $1,181 |
$10,017
84,408
kWh
|
- | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,026 | $64 |
$3,026
25,498
kWh
|
- | - | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $730 | $60 |
$730
6,155
kWh
|
- | - | - | |
04 | 2.4227: Use compressor air filters | $1,245 | - |
$1,565
13,189
kWh
|
- | - | $(-320.0) | |
05 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $9,896 | $1,900 |
$9,896
-
kWh
|
- | - | - | |
06 | 2.2437: Recover waste heat from equipment | $2,761 | $1,900 | - | - |
$2,761
-
MMBtu
|
- | |
07 | 2.2136: Install / repair insulation on steam lines | $1,091 | $1,422 | - | - |
$1,091
-
MMBtu
|
- | |
08 | 2.2514: Cover open tanks | $417 | $420 | - | - |
$417
-
MMBtu
|
- | |
09 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $217 | $400 |
$243
2,052
kWh
|
$(-26.0)
-
MMBtu
|
- | - | |
10 | 2.2135: Repair and eliminate steam leaks | $7,660 | $100 | - | - |
$7,660
-
MMBtu
|
- | |
11 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,387 | $61 | - | - |
$1,387
-
MMBtu
|
- | |
12 | 2.1233: Analyze flue gas for proper air/fuel ratio | $15,337 | $537 | - | - |
$15,337
-
MMBtu
|
- | |
13 | 2.2414: Use waste heat from hot flue gases to preheat | $8,211 | $3,000 | - | - |
$8,211
-
MMBtu
|
- | |
14 | 2.7494: Install storm windows and doors | $963 | $500 | - | - |
$963
-
MMBtu
|
- | |
15 | 2.7261: Install timers and/or thermostats | $11,903 | $675 | - | - |
$11,903
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $74,861 | $12,220 |
$25,477
131,302
kWh
|
$(-26.0)
-
MMBtu
|
$49,730
-
MMBtu
|
$(-320.0) | ||
TOTAL IMPLEMENTED | $51,769 | $6,245 |
$25,234
129,250
kWh
|
- |
$26,855
-
MMBtu
|
$(-320.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs