ITAC Assessment: ST0028
ITAC logo
ITAC Assessment: ST0028
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product BLENDED & BOTTLED SPIRIT
NAICS
n/a
SIC 2085: Distilled and Blended Liquors
Sales Range $10
M
to 50
M
# of Employees 53
Plant Area
n/a
Annual Production 7,000
Tgal
Production Hrs. Annual 2,125
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $39,249 353,458
kWh
Natural Gas $46,755 7,497
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,709 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,640

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,542 $733 $2,542
22,860
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,376 $96 $5,376
48,359
kWh
-
03 2.5194: Redesign process $1,064 - $1,064
9,672
kWh
-
04 2.6212: Turn off equipment during breaks, reduce operating time $446 - $446
4,103
kWh
-
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $259 $750 $338
2,931
kWh
$(-79.0)
-
MMBtu
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $640 $900 $836
7,620
kWh
$(-196.0)
-
MMBtu
07 2.4221: Install compressor air intakes in coolest locations $120 $50 $120
1,172
kWh
-
08 2.2437: Recover waste heat from equipment $1,380 $1,600 - $1,380
-
MMBtu
09 2.7261: Install timers and/or thermostats $2,196 $900 - $2,196
-
MMBtu
10 2.7494: Install storm windows and doors $4,625 $9,283 - $4,625
-
MMBtu
11 2.7447: Install vinyl strip / high speed / air curtain doors $5,061 $5,000 - $5,061
-
MMBtu
TOTAL RECOMMENDED $23,709 $19,312 $10,722
96,717
kWh
$12,987
-
MMBtu
TOTAL IMPLEMENTED $16,640 $8,429 $9,658
87,045
kWh
$6,982
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs