ITAC Assessment: SF0395
ITAC logo
ITAC Assessment: SF0395
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product PVC, HDPE, ABS Pipe
NAICS 326122: Plastics Pipe and Pipe Fitting Manufacturing
SIC 3084: Plastics Pipe
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 252,799
ft2
Annual Production 90,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,650,036 21,175,483
kWh
Electricity Demand $482,994 50,328
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $163,652 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $54,244

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.7261: Install timers and/or thermostats $6,724 - $6,724
89,177
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,312 - $4,312
57,182
kWh
- -
03 2.6231: Utilize controls to operate equipment only when needed $3,795 $4,576 $3,795
50,333
kWh
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $11,313 $7,243 $8,110
107,570
kWh
$3,203
-
kW-mo/yr
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,833 $5,753 $3,465
45,961
kWh
$1,368
-
kW-mo/yr
-
06 2.4227: Use compressor air filters $1,038 $1,467 $1,038
13,763
kWh
- -
07 2.4133: Use most efficient type of electric motors $13,112 $6,182 $9,087
120,518
kWh
$4,025
-
kW-mo/yr
-
08 2.7135: Install occupancy sensors $3,218 $6,195 $2,316
30,719
kWh
$902
-
kW-mo/yr
-
09 2.2511: Insulate bare equipment $8,140 $22,037 $8,140
107,961
kWh
- -
10 2.2622: Replace existing chiller with high efficiency model $4,772 $18,000 $3,420
45,360
kWh
$1,352
-
kW-mo/yr
-
11 2.7142: Utilize higher efficiency lamps and/or ballasts $5,959 $41,361 $5,631
74,677
kWh
- $328
12 2.9114: Use solar heat to make electricty $96,436 $3,735,000 $68,850
866,812
kWh
$27,586
-
kW-mo/yr
-
TOTAL RECOMMENDED $163,652 $3,847,814 $124,888
1,610,033
kWh
$38,436
-
kW-mo/yr
$328
TOTAL IMPLEMENTED $54,244 $60,682 $44,296
587,492
kWh
$9,948
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs