ITAC Assessment: RU0121
ITAC logo
ITAC Assessment: RU0121
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product HOME CONSUMER PRODUCTS
NAICS
n/a
SIC 3088: Plastics Plumbing Fixtures
Sales Range n/a
# of Employees 330
Plant Area
n/a
Annual Production 900,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $583,401 6,821,805
kWh
Natural Gas $149,588 33,498
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $74,946 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $74,946

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $9,136 - $9,136
91,442
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $1,316 $267 $1,316
15,533
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,917 $459 $3,917
45,721
kWh
-
04 2.1233: Analyze flue gas for proper air/fuel ratio $300 $500 - $300
-
MMBtu
05 2.6212: Turn off equipment during breaks, reduce operating time $3,648 - $3,648
42,790
kWh
-
06 2.6121: Reduce hot water temperature to the minimum required $51,300 - $51,300
600,528
kWh
-
07 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $5,329 $900 - $5,329
-
MMBtu
TOTAL RECOMMENDED $74,946 $2,126 $69,317
796,014
kWh
$5,629
-
MMBtu
TOTAL IMPLEMENTED $74,946 $2,126 $69,317
796,014
kWh
$5,629
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs