ITAC Assessment: LE0242
ITAC logo
ITAC Assessment: LE0242
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Pnuematic Valves
NAICS 332912: Fluid Power Valve and Hose Fitting Manufacturing
SIC 3492: Fluid Power Valves and Hose Fittings
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 50,000
ft2
Annual Production 20,000,000
pieces
Production Hrs. Annual 2,860
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $100,445 1,190,160
kWh
Electricity Demand $40,049 4,202
kW-mo/yr
Natural Gas $32,681 2,424
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $779,298 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $778,647

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.9114: Use solar heat to make electricty $734,219 $1,251,036 $33,683
400,982
kWh
- $700,536 - -
02 2.7261: Install timers and/or thermostats $22,987 $20,000 $12,394
147,549
kWh
$4,925
-
kW-mo/yr
- $5,668
-
MMBtu
-
03 3.5217: Reuse / recycle/ sell paper products $7,219 $960 - - - - $7,219
-
lb
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,843 $1,000 $4,634
55,188
kWh
$2,209
-
kW-mo/yr
- - -
05 2.7232: Replace existing hvac unit with high efficiency model $2,240 $6,400 $1,399
16,650
kWh
$841
-
kW-mo/yr
- - -
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,001 $2,000 - $2,001
-
kW-mo/yr
- - -
07 2.4221: Install compressor air intakes in coolest locations $996 $1,000 $674
8,018
kWh
$322
-
kW-mo/yr
- - -
08 2.7135: Install occupancy sensors $152 $75 $152
1,812
kWh
- - - -
09 2.7135: Install occupancy sensors $651 $450 $543
6,468
kWh
$108
-
kW-mo/yr
- - -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $1,990 $8,750 $1,258
14,976
kWh
$732
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $779,298 $1,291,671 $54,737
651,643
kWh
$11,138
-
kW-mo/yr
$700,536 $5,668
-
MMBtu
$7,219
-
lb
TOTAL IMPLEMENTED $778,647 $1,291,221 $54,194
645,175
kWh
$11,030
-
kW-mo/yr
$700,536 $5,668
-
MMBtu
$7,219
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs