Assessment Year | 2006 |
---|---|
Principal Product | Pnuematic Valves |
NAICS | 332912: Fluid Power Valve and Hose Fitting Manufacturing |
SIC | 3492: Fluid Power Valves and Hose Fittings |
Sales Range | $10 M to 50M |
# of Employees | 130 |
Plant Area |
50,000
ft2
|
Annual Production | 20,000,000
pieces
|
Production Hrs. Annual | 2,860
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $100,445 | 1,190,160 |
kWh
|
$0.084 |
Electricity Demand | $40,049 | 4,202 |
kW-mo/yr
|
$9.53 |
Natural Gas | $32,681 | 2,424 |
MMBtu
|
$13.48 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $779,298 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $778,647 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $734,219 | $1,251,036 |
$33,683
400,982
kWh
|
- | $700,536 | - | - | |
02 | 2.7261: Install timers and/or thermostats | $22,987 | $20,000 |
$12,394
147,549
kWh
|
$4,925
-
kW-mo/yr
|
- |
$5,668
-
MMBtu
|
- | |
03 | 3.5217: Reuse / recycle/ sell paper products | $7,219 | $960 | - | - | - | - |
$7,219
-
lb
|
|
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,843 | $1,000 |
$4,634
55,188
kWh
|
$2,209
-
kW-mo/yr
|
- | - | - | |
05 | 2.7232: Replace existing hvac unit with high efficiency model | $2,240 | $6,400 |
$1,399
16,650
kWh
|
$841
-
kW-mo/yr
|
- | - | - | |
06 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $2,001 | $2,000 | - |
$2,001
-
kW-mo/yr
|
- | - | - | |
07 | 2.4221: Install compressor air intakes in coolest locations | $996 | $1,000 |
$674
8,018
kWh
|
$322
-
kW-mo/yr
|
- | - | - | |
08 | 2.7135: Install occupancy sensors | $152 | $75 |
$152
1,812
kWh
|
- | - | - | - | |
09 | 2.7135: Install occupancy sensors | $651 | $450 |
$543
6,468
kWh
|
$108
-
kW-mo/yr
|
- | - | - | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,990 | $8,750 |
$1,258
14,976
kWh
|
$732
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $779,298 | $1,291,671 |
$54,737
651,643
kWh
|
$11,138
-
kW-mo/yr
|
$700,536 |
$5,668
-
MMBtu
|
$7,219
-
lb
|
||
TOTAL IMPLEMENTED | $778,647 | $1,291,221 |
$54,194
645,175
kWh
|
$11,030
-
kW-mo/yr
|
$700,536 |
$5,668
-
MMBtu
|
$7,219
-
lb
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs