| Assessment Year | 1993 |
|---|---|
| Principal Product | ANODIZING AND PLATING |
| NAICS |
n/a
|
| SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
| Sales Range | $1 M to 5M |
| # of Employees | 88 |
| Plant Area |
n/a
|
| Annual Production | 5,000,000
pieces
|
| Production Hrs. Annual | 6,120
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $73,477 | 570,340 |
kWh
|
$0.13 |
| Natural Gas | $59,871 | 15,097 |
MMBtu
|
$3.97 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $60,730 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $51,068 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | Primary Raw Material Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $1,693 | $507 |
$1,693
9,965
kWh
|
- | - | - | |
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $7,934 | - |
$7,934
46,014
kWh
|
- | - | - | |
| 03 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $6,874 | $1,012 |
$6,874
39,859
kWh
|
- | - | - | |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $2,788 | $315 |
$2,788
16,120
kWh
|
- | - | - | |
| 05 | 2.6231: Utilize controls to operate equipment only when needed | $893 | $300 |
$893
5,275
kWh
|
- | - | - | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $17,069 | $120 |
$17,069
99,062
kWh
|
- | - | - | |
| 07 | 2.2444: Use hot process fluids to preheat incoming process fluids | $2,751 | $3,889 |
$(-1,229.0)
(-7,034)
kWh
|
$3,980
-
MMBtu
|
- | - | |
| 08 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $9,375 | $15,000 | - | - | - | $9,375 | |
| 09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,598 | - |
$5,756
33,411
kWh
|
- | $(-158.0) | - | |
| 10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $51 | $180 |
$51
293
kWh
|
- | - | - | |
| 11 | 2.7144: Install spectral reflectors / delamp | $1,691 | $1,140 |
$1,590
9,086
kWh
|
- | $101 | - | |
| 12 | 2.6232: Install set-back timers | $376 | $600 |
$362
2,052
kWh
|
- | $14 | - | |
| 13 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $369 | - |
$572
3,224
kWh
|
- | $(-203.0) | - | |
| 14 | 2.7144: Install spectral reflectors / delamp | $1,774 | $916 |
$1,774
9,672
kWh
|
- | - | - | |
| 15 | 2.6232: Install set-back timers | $328 | $25 |
$309
1,758
kWh
|
- | $19 | - | |
| 16 | 2.7261: Install timers and/or thermostats | $1,166 | $300 |
$758
4,396
kWh
|
$408
-
MMBtu
|
- | - | |
| TOTAL RECOMMENDED | $60,730 | $24,304 |
$47,194
273,153
kWh
|
$4,388
-
MMBtu
|
$(-227.0) | $9,375 | ||
| TOTAL IMPLEMENTED | $51,068 | $22,977 |
$37,532
217,174
kWh
|
$4,388
-
MMBtu
|
$(-227.0) | $9,375 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | Primary Raw Material Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs