ITAC Assessment: TA0128
ITAC logo
ITAC Assessment: TA0128
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Forging Die-Tools
NAICS 333514: Special Die and Tool, Die Set, Jig, and Fixture Manufacturing
SIC 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds
Sales Range $1
M
to 5
M
# of Employees 13
Plant Area 11,200
ft2
Annual Production 400
units
Production Hrs. Annual 2,569
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $17,357 135,264
kWh
Electricity Demand $6,551 922
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $64,567 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,981 $1,440 $3,164
24,722
kWh
$817
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,627 $1,030 $2,208
17,253
kWh
$419
-
kW-mo/yr
03 2.7243: Improve air circulation with destratification fans / other methods $52,032 $10,650 $52,032
406,502
kWh
-
04 2.7442: Keep doors and windows shut when not on use $5,927 - $5,927
46,307
kWh
-
TOTAL RECOMMENDED $64,567 $13,120 $63,331
494,784
kWh
$1,236
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs