ITAC Assessment: SD0035
ITAC logo
ITAC Assessment: SD0035
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product COMMUNICATION EQUIPMENT
NAICS
n/a
SIC 3669: Communications Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 139
Plant Area
n/a
Annual Production 200
pieces
Production Hrs. Annual 6,240
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $171,720 1,655,627
kWh
Natural Gas $128 11
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,682 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $217 $1,370 $217
2,052
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,708 $1,981 $5,168
49,824
kWh
$(-460.0)
03 2.7123: Keep lamps and reflectors clean $9,251 $16,150 $8,219
79,132
kWh
$1,032
04 2.6232: Install set-back timers $1,966 $2,240 $1,730
16,706
kWh
$236
05 2.7142: Utilize higher efficiency lamps and/or ballasts $555 $785 $331
3,224
kWh
$224
06 2.7261: Install timers and/or thermostats $19,144 $400 $19,144
184,349
kWh
-
07 2.4231: Reduce the pressure of compressed air to the minimum required $598 $20 $598
5,862
kWh
-
08 2.4221: Install compressor air intakes in coolest locations $243 $188 $243
2,345
kWh
-
TOTAL RECOMMENDED $36,682 $23,134 $35,650
343,494
kWh
$1,032
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs