ITAC Assessment: AS0191
ITAC logo
ITAC Assessment: AS0191
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Concrete Pipe
NAICS
n/a
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 1,800,000
ft2
Annual Production 0
units
Production Hrs. Annual 3,000
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $259,892 3,305,686
kWh
Electricity Demand $22,594 11,532
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,347 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,322

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
01 2.7232: Replace existing hvac unit with high efficiency model $1,786 $2,100 $1,512
33,998
kWh
$274
-
kW-mo/yr
- - -
02 2.7261: Install timers and/or thermostats $457 $960 $457
9,672
kWh
- - - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,267 - $1,079
22,860
kWh
$188
-
kW-mo/yr
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,678 $420 $3,056
64,771
kWh
$622
-
kW-mo/yr
- - -
05 2.4314: Use synthetic lubricant $3,607 $1,677 $2,900
61,547
kWh
$529
-
kW-mo/yr
$24
-
gal
- $154
06 2.4226: Use / purchase optimum sized compressor $18,782 - $16,234
344,373
kWh
$2,548
-
kW-mo/yr
- - -
07 2.4133: Use most efficient type of electric motors $5,193 $9,357 $4,402
93,494
kWh
$791
-
kW-mo/yr
- - -
08 2.7135: Install occupancy sensors $1,427 $3,300 $1,427
30,481
kWh
- - - -
09 3.5316: Contract a wood pallet recycling company $150 - - - - $150
-
lb
-
TOTAL RECOMMENDED $36,347 $17,814 $31,067
661,196
kWh
$4,952
-
kW-mo/yr
$24
-
gal
$150
-
lb
$154
TOTAL IMPLEMENTED $15,322 $14,754 $12,864
273,153
kWh
$2,130
-
kW-mo/yr
$24
-
gal
$150
-
lb
$154
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs