ITAC Assessment: OK0122
ITAC logo
ITAC Assessment: OK0122
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product CRANE BLOCKS
NAICS
n/a
SIC 3429: Hardware, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 200
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 0
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $72,650 1,539,859
kWh
Natural Gas $25,016 7,059
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,610 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,112

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $1,546 $346 - $1,546
-
MMBtu
02 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $649 $235 $539
17,585
kWh
$110
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $874 $923 $874
18,464
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,414 $290 $1,414
46,014
kWh
-
05 2.7447: Install vinyl strip / high speed / air curtain doors $2,584 $2,024 - $2,584
-
MMBtu
06 2.7229: Air condition only space necessary $272 $70 - $272
-
MMBtu
07 2.7314: Reduce ventilation air $316 $40 $59
2,052
kWh
$257
-
MMBtu
08 2.6124: Establish equipment maintenance schedule $435 $693 $435
14,068
kWh
-
09 2.7261: Install timers and/or thermostats $5,840 $9,307 - $5,840
-
MMBtu
10 2.3212: Optimize plant power factor $1,680 $6,550 $1,680
-
kWh
-
TOTAL RECOMMENDED $15,610 $20,478 $5,001
98,183
kWh
$10,609
-
MMBtu
TOTAL IMPLEMENTED $12,112 $13,512 $3,321
98,183
kWh
$8,791
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs