Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product FLYERS,MAILERS,PUBLICAT.
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $1
M
to 5
M
# of Employees 25
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,080
hrs
Location (State) Maryland

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $47,271 500,293
kWh
Natural Gas $2,795 429
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,127 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $216 $2,016 $262
2,638
kWh
- $(-46.0)
02 2.7447: Install vinyl strip / high speed / air curtain doors $1,376 $3,850 $765
8,206
kWh
$611
-
MMBtu
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $646 - $646
6,741
kWh
- -
04 2.7121: Utilize daylight whenever possible in lieu of artificial light $900 $5,500 $900
9,379
kWh
- -
05 2.7261: Install timers and/or thermostats $5,738 $478 $3,782
40,152
kWh
$1,956
-
MMBtu
-
06 2.8121: Apply for tax-free status for energy purchases $2,251 - $2,251
-
kWh
- -
TOTAL RECOMMENDED $11,127 $11,844 $8,606
67,116
kWh
$2,567
-
MMBtu
$(-46.0)
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs