ITAC Assessment: RU0139
ITAC logo
ITAC Assessment: RU0139
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product COMMERCIAL FOLDING BOXES
NAICS
n/a
SIC 2657: Folding Paperboard Boxes, Including Sanitary
Sales Range $10
M
to 50
M
# of Employees 137
Plant Area
n/a
Annual Production 250,000,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $182,715 1,981,536
kWh
Natural Gas $46,022 8,237
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,592 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $40,592

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.6121: Reduce hot water temperature to the minimum required $10,985 $201 $10,985
119,285
kWh
- -
02 2.4221: Install compressor air intakes in coolest locations $1,401 $68 $1,401
15,240
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,050 $2,523 $3,416
37,222
kWh
- $(-366.0)
04 2.3191: Use demand controller or load shedder $10,165 $2,500 $10,165
-
kWh
- -
05 2.1233: Analyze flue gas for proper air/fuel ratio $921 $500 - $921
-
MMBtu
-
06 2.7444: Close holes and openings in building such as broken windows $14,070 - - $14,070
-
MMBtu
-
TOTAL RECOMMENDED $40,592 $5,792 $25,967
171,747
kWh
$14,991
-
MMBtu
$(-366.0)
TOTAL IMPLEMENTED $40,592 $5,792 $25,967
171,747
kWh
$14,991
-
MMBtu
$(-366.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs