Assessment Year | 2012 |
---|---|
Principal Product | zinc and plated fixtures |
NAICS | 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers |
SIC | 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 65 |
Plant Area |
110,000
ft2
|
Annual Production | 300
ton
|
Production Hrs. Annual | 4,950
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $84,441 | 1,472,920 |
kWh
|
$0.057 |
Electricity Demand | $22,028 | 4,901 |
kW-mo/yr
|
$4.49 |
Natural Gas | $406,039 | 52,494 |
MMBtu
|
$7.73 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $156,643 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $154,995 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,648 | $820 |
$1,388
23,137
kWh
|
$260
-
kW-mo/yr
|
- | |
02 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $79,573 | $6,500 | - | - |
$79,573
-
MMBtu
|
|
03 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $72,621 | $8,500 | - | - |
$72,621
-
MMBtu
|
|
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,801 | $8,200 |
$2,370
39,501
kWh
|
$431
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $156,643 | $24,020 |
$3,758
62,638
kWh
|
$691
-
kW-mo/yr
|
$152,194
-
MMBtu
|
||
TOTAL IMPLEMENTED | $154,995 | $23,200 |
$2,370
39,501
kWh
|
$431
-
kW-mo/yr
|
$152,194
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs