ITAC Assessment: RU0137
ITAC logo
ITAC Assessment: RU0137
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product COMMERCIAL DISHWASHERS
NAICS
n/a
SIC 3589: Service Industry Machinery, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 72
Plant Area
n/a
Annual Production 630
pieces
Production Hrs. Annual 2,250
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $38,973 279,015
kWh
Natural Gas $24,779 4,369
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,973 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,718

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2136: Install / repair insulation on steam lines $680 $426 - $680
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $121 $2,197 $242
2,052
kWh
- $(-121.0)
03 2.7261: Install timers and/or thermostats $4,071 $239 - $4,071
-
MMBtu
-
04 2.1233: Analyze flue gas for proper air/fuel ratio $476 $500 - $476
-
MMBtu
-
05 2.4221: Install compressor air intakes in coolest locations $184 $57 $184
1,465
kWh
- -
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $4,441 - $4,441
-
kWh
- -
TOTAL RECOMMENDED $9,973 $3,419 $4,867
3,517
kWh
$5,227
-
MMBtu
$(-121.0)
TOTAL IMPLEMENTED $5,718 $3,123 $4,683
2,052
kWh
$1,156
-
MMBtu
$(-121.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings