Assessment Year | 1992 |
---|---|
Principal Product | COMMERCIAL DISHWASHERS |
NAICS |
n/a
|
SIC | 3589: Service Industry Machinery, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 72 |
Plant Area |
n/a
|
Annual Production | 630
pieces
|
Production Hrs. Annual | 2,250
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $38,973 | 279,015 |
kWh
|
$0.14 |
Natural Gas | $24,779 | 4,369 |
MMBtu
|
$5.67 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $9,973 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,718 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.2136: Install / repair insulation on steam lines | $680 | $426 | - |
$680
-
MMBtu
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $121 | $2,197 |
$242
2,052
kWh
|
- | $(-121.0) | |
03 | 2.7261: Install timers and/or thermostats | $4,071 | $239 | - |
$4,071
-
MMBtu
|
- | |
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $476 | $500 | - |
$476
-
MMBtu
|
- | |
05 | 2.4221: Install compressor air intakes in coolest locations | $184 | $57 |
$184
1,465
kWh
|
- | - | |
06 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $4,441 | - |
$4,441
-
kWh
|
- | - | |
TOTAL RECOMMENDED | $9,973 | $3,419 |
$4,867
3,517
kWh
|
$5,227
-
MMBtu
|
$(-121.0) | ||
TOTAL IMPLEMENTED | $5,718 | $3,123 |
$4,683
2,052
kWh
|
$1,156
-
MMBtu
|
$(-121.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs