Assessment Year | 2019 |
---|---|
Principal Product | High Density Insulation |
NAICS | 326150: Urethane and Other Foam Product (except Polystyrene) Manufacturing |
SIC | 3086: Plastics Foam Products |
Sales Range | $10 M to 50M |
# of Employees | 80 |
Plant Area |
20,000
ft2
|
Annual Production | 13,700
units
|
Production Hrs. Annual | 4,192
hrs
|
Location (State) | Delaware |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $58,060 | 748,309 |
kWh
|
$0.078 | |
Electricity Demand | $16,290 | 2,988 |
kW-mo/yr
|
$5.45 | |
Natural Gas | $27,246 | 3,383 |
MMBtu
|
$8.05 | |
Waste Disposal Costs | |||||
Water Usage | $44,136 | 3,600 |
Tgal
|
$12.26 | |
TOTAL YEARLY COSTS | $145,732 | ||||
RECOMMENDED SAVINGS* | $48,110 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Usage Savings |
---|---|---|---|---|---|---|---|
01 | 3.4115: Recover and reuse cooling water | $13,590 | $4,000 |
$1,330
13,450
kWh
|
- |
$12,260
-
Tgal
|
|
02 | 2.7243: Improve air circulation with destratification fans / other methods | $470 | $750 |
$470
4,710
kWh
|
- | - | |
03 | 2.7261: Install timers and/or thermostats | $640 | $60 |
$340
4,330
kWh
|
$300
-
MMBtu
|
- | |
04 | 3.4111: Use closed cycle process to minimize waste water production | $18,880 | $10,000 | - | - |
$18,880
-
Tgal
|
|
05 | 2.4239: Eliminate or reduce compressed air usage | $910 | $1,000 |
$910
9,220
kWh
|
- | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,720 | $2,500 |
$1,720
17,330
kWh
|
- | - | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $11,900 | $2,750 |
$11,900
120,100
kWh
|
- | - | |
TOTAL RECOMMENDED | $48,110 | $21,060 |
$16,670
169,140
kWh
|
$300
-
MMBtu
|
$31,140
-
Tgal
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Usage Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs