Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Ice Cream and Beverages
NAICS 311520: Ice Cream and Frozen Dessert Manufacturing
SIC 2024: Ice Cream and Frozen Desserts
Sales Range $100
M
to 500
M
# of Employees 185
Plant Area 145,350
ft2
Annual Production 31,000
Tgal
Production Hrs. Annual 8,112
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,012,116 44,713,681
kWh
Electricity Demand $397,832 99,210
kW-mo/yr
Natural Gas $175,109 54,397
MMBtu
Waste Disposal Costs
Water Usage $312,439 87,924
Tgal
Water Disposal $1,737,246 38,169
Tgal
TOTAL YEARLY COSTS $4,634,742
RECOMMENDED SAVINGS* $1,247,486 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Ancillary Material Cost Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $515 - $455
10,112
kWh
$60
-
kW-mo/yr
- - - -
02 2.2437: Recover waste heat from equipment $62,174 $26,600 $16,123
358,284
kWh
- $46,051
-
MMBtu
- - -
03 2.2696: Use excess cold process fluid for industrial cooling needs $25,124 - $22,391
497,568
kWh
$2,733
-
kW-mo/yr
- - - -
04 2.5194: Redesign process $43,180 $20,000 - - $1,335
-
MMBtu
$3,072
-
Tgal
$38,773
-
Tgal
-
05 2.4239: Eliminate or reduce compressed air usage $1,584 $1,500 $1,401
31,140
kWh
$183
-
kW-mo/yr
- - - -
06 2.1221: Replace obsolete burners with more efficient ones $16,717 $64,900 - - $16,717
-
MMBtu
- - -
07 2.1233: Analyze flue gas for proper air/fuel ratio $1,072 - - - $1,072
-
MMBtu
- - -
08 2.2511: Insulate bare equipment $359 $392 - - $359
-
MMBtu
- - -
09 3.4131: Minimize contamination of water before treatment $1,096,761 $5,000,000 - - - - - $1,096,761
TOTAL RECOMMENDED $1,247,486 $5,113,392 $40,370
897,104
kWh
$2,976
-
kW-mo/yr
$65,534
-
MMBtu
$3,072
-
Tgal
$38,773
-
Tgal
$1,096,761
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Ancillary Material Cost Savings