ITAC Assessment: RU0077
ITAC logo
ITAC Assessment: RU0077
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product STEEL STRUCTURES
NAICS
n/a
SIC 3441: Fabricated Structural Metal
Sales Range $10
M
to 50
M
# of Employees 190
Plant Area
n/a
Annual Production 8,000
ton
Production Hrs. Annual 2,000
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $293,307 2,783,998
kWh
Fuel Oil #2 $68,005 16,380
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,996 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,296

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.4221: Install compressor air intakes in coolest locations $1,686 $102 $1,686
15,240
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,408 $650 $2,408
21,981
kWh
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $2,140 $5,700 $2,140
19,343
kWh
-
04 2.7441: Replace broken windows and/or window sash $5,202 $450 - $5,202
-
MMBtu
05 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $1,560 $340 - $1,560
-
MMBtu
TOTAL RECOMMENDED $12,996 $7,242 $6,234
56,564
kWh
$6,762
-
MMBtu
TOTAL IMPLEMENTED $9,296 $1,202 $4,094
37,221
kWh
$5,202
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs