Assessment Year | 1989 |
---|---|
Principal Product | DIAGNOSTIC MATERIALS |
NAICS |
n/a
|
SIC | 2869: Industrial Organic Chemicals, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
n/a
|
Annual Production | 1,000,000
pieces
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $281,589 | 4,012,016 |
kWh
|
$0.070 |
Natural Gas | $59,441 | 13,451 |
MMBtu
|
$4.42 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $34,169 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,484 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7221: Lower temperature during the winter season and vice-versa | $15,813 | - |
$15,813
225,967
kWh
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $360 | $295 |
$360
5,275
kWh
|
- | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $738 | - |
$738
10,551
kWh
|
- | |
04 | 2.4221: Install compressor air intakes in coolest locations | $554 | $117 |
$554
7,913
kWh
|
- | |
05 | 2.7444: Close holes and openings in building such as broken windows | $3,352 | $50 |
$2,180
31,067
kWh
|
$1,172
-
MMBtu
|
|
06 | 2.2414: Use waste heat from hot flue gases to preheat | $6,906 | $6,800 | - |
$6,906
-
MMBtu
|
|
07 | 2.7243: Improve air circulation with destratification fans / other methods | $4,674 | $2,700 |
$(-316.0)
(-4,396)
kWh
|
$4,990
-
MMBtu
|
|
08 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,772 | $500 | - |
$1,772
-
MMBtu
|
|
TOTAL RECOMMENDED | $34,169 | $10,462 |
$19,329
276,377
kWh
|
$14,840
-
MMBtu
|
||
TOTAL IMPLEMENTED | $5,484 | $845 |
$2,540
36,342
kWh
|
$2,944
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs