ITAC Assessment: RU0071
ITAC logo
ITAC Assessment: RU0071
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product DIAGNOSTIC MATERIALS
NAICS
n/a
SIC 2869: Industrial Organic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 1,000,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $281,589 4,012,016
kWh
Natural Gas $59,441 13,451
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,169 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,484

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7221: Lower temperature during the winter season and vice-versa $15,813 - $15,813
225,967
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $360 $295 $360
5,275
kWh
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $738 - $738
10,551
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $554 $117 $554
7,913
kWh
-
05 2.7444: Close holes and openings in building such as broken windows $3,352 $50 $2,180
31,067
kWh
$1,172
-
MMBtu
06 2.2414: Use waste heat from hot flue gases to preheat $6,906 $6,800 - $6,906
-
MMBtu
07 2.7243: Improve air circulation with destratification fans / other methods $4,674 $2,700 $(-316.0)
(-4,396)
kWh
$4,990
-
MMBtu
08 2.1233: Analyze flue gas for proper air/fuel ratio $1,772 $500 - $1,772
-
MMBtu
TOTAL RECOMMENDED $34,169 $10,462 $19,329
276,377
kWh
$14,840
-
MMBtu
TOTAL IMPLEMENTED $5,484 $845 $2,540
36,342
kWh
$2,944
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs