ITAC Assessment: MS0158
ITAC logo
ITAC Assessment: MS0158
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Nylon Hosiery
NAICS
n/a
SIC 2251: Women's Full-Length and Knee-Length Hosiery, Except Socks
Sales Range $10
M
to 50
M
# of Employees 360
Plant Area 460,000
ft2
Annual Production 9,600,000
units
Production Hrs. Annual 6,000
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $652,186 13,923,505
kWh
Electricity Demand $96,022 33,948
kW-mo/yr
Electricity Fees $(-52,735.0) -
Natural Gas $274,986 81,011
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $131,050 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $1,578 $409 $1,536
44,256
kWh
$243
-
kW-mo/yr
$(-201.0) -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,170 $557 $2,654
76,202
kWh
- $(-484.0) -
03 2.7261: Install timers and/or thermostats $3,065 $4,425 $3,749
107,855
kWh
- $(-684.0) -
04 2.1224: Replace boiler $124,237 $80,166 - - - $124,237
-
MMBtu
TOTAL RECOMMENDED $131,050 $85,557 $7,939
228,313
kWh
$243
-
kW-mo/yr
$(-1,369.0) $124,237
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs