ITAC Assessment: RU0067
ITAC logo
ITAC Assessment: RU0067
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product PRINTED & LAMIN. VINYLS
NAICS
n/a
SIC 2392: House furnishing, Except Curtains and Draperies
Sales Range $1
M
to 5
M
# of Employees 60
Plant Area
n/a
Annual Production 162,000
thousand feet
Production Hrs. Annual 4,000
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $132,007 1,519,930
kWh
Natural Gas $91,809 19,789
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,015 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,260

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6232: Install set-back timers $2,936 $240 $2,936
33,705
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $619 $164 $619
7,034
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,152 - $1,152
13,189
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $645 $49 $645
7,327
kWh
-
05 2.2414: Use waste heat from hot flue gases to preheat $3,637 $6,800 - $3,637
-
MMBtu
06 2.2437: Recover waste heat from equipment $12,720 $53,500 - $12,720
-
MMBtu
07 2.1233: Analyze flue gas for proper air/fuel ratio $2,844 $500 - $2,844
-
MMBtu
08 2.7492: Use proper thickness of insulation on building envelope $2,462 $5,460 - $2,462
-
MMBtu
TOTAL RECOMMENDED $27,015 $66,713 $5,352
61,255
kWh
$21,663
-
MMBtu
TOTAL IMPLEMENTED $5,260 $713 $2,416
27,550
kWh
$2,844
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs