| Assessment Year | 1989 |
|---|---|
| Principal Product | PRINTED & LAMIN. VINYLS |
| NAICS |
n/a
|
| SIC | 2392: House furnishing, Except Curtains and Draperies |
| Sales Range | $1 M to 5M |
| # of Employees | 60 |
| Plant Area |
n/a
|
| Annual Production | 162,000
thousand feet
|
| Production Hrs. Annual | 4,000
hrs
|
| Location (State) | New Jersey |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $132,007 | 1,519,930 |
kWh
|
$0.087 |
| Natural Gas | $91,809 | 19,789 |
MMBtu
|
$4.64 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $27,015 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $5,260 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.6232: Install set-back timers | $2,936 | $240 |
$2,936
33,705
kWh
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $619 | $164 |
$619
7,034
kWh
|
- | |
| 03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,152 | - |
$1,152
13,189
kWh
|
- | |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $645 | $49 |
$645
7,327
kWh
|
- | |
| 05 | 2.2414: Use waste heat from hot flue gases to preheat | $3,637 | $6,800 | - |
$3,637
-
MMBtu
|
|
| 06 | 2.2437: Recover waste heat from equipment | $12,720 | $53,500 | - |
$12,720
-
MMBtu
|
|
| 07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,844 | $500 | - |
$2,844
-
MMBtu
|
|
| 08 | 2.7492: Use proper thickness of insulation on building envelope | $2,462 | $5,460 | - |
$2,462
-
MMBtu
|
|
| TOTAL RECOMMENDED | $27,015 | $66,713 |
$5,352
61,255
kWh
|
$21,663
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $5,260 | $713 |
$2,416
27,550
kWh
|
$2,844
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs