| Assessment Year | 1988 |
|---|---|
| Principal Product | LAMPS |
| NAICS |
n/a
|
| SIC | 3641: Electric Lamp Bulbs and Tubes |
| Sales Range | $10 M to 50M |
| # of Employees | 200 |
| Plant Area |
n/a
|
| Annual Production | 90,000
pieces
|
| Production Hrs. Annual | 0
hrs
|
| Location (State) | New Jersey |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $215,525 | 2,636,870 |
kWh
|
$0.082 |
| Natural Gas | $4,682 | 783 |
MMBtu
|
$5.98 |
| LPG | $10,457 | 1,078 |
MMBtu
|
$9.70 |
| Fuel Oil #4 | $61,924 | 15,379 |
MMBtu
|
$4.03 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $7,328 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $6,316 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #4 Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $296 | - |
$296
3,517
kWh
|
- | |
| 02 | 2.4221: Install compressor air intakes in coolest locations | $173 | $72 |
$173
2,052
kWh
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,300 | $596 |
$2,300
28,136
kWh
|
- | |
| 04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $236 | $260 | - |
$236
-
MMBtu
|
|
| 05 | 2.2511: Insulate bare equipment | $509 | $347 |
$509
6,155
kWh
|
- | |
| 06 | 2.2514: Cover open tanks | $716 | $480 |
$716
8,792
kWh
|
- | |
| 07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,098 | $500 | - |
$3,098
-
MMBtu
|
|
| TOTAL RECOMMENDED | $7,328 | $2,255 |
$3,994
48,652
kWh
|
$3,334
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $6,316 | $1,775 |
$2,982
36,343
kWh
|
$3,334
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #4 Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs