ITAC Assessment: RU0032
ITAC logo
ITAC Assessment: RU0032
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product LAMPS
NAICS
n/a
SIC 3641: Electric Lamp Bulbs and Tubes
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area
n/a
Annual Production 90,000
pieces
Production Hrs. Annual 0
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $215,525 2,636,870
kWh
Natural Gas $4,682 783
MMBtu
LPG $10,457 1,078
MMBtu
Fuel Oil #4 $61,924 15,379
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,328 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,316

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #4 Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $296 - $296
3,517
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $173 $72 $173
2,052
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,300 $596 $2,300
28,136
kWh
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $236 $260 - $236
-
MMBtu
05 2.2511: Insulate bare equipment $509 $347 $509
6,155
kWh
-
06 2.2514: Cover open tanks $716 $480 $716
8,792
kWh
-
07 2.1233: Analyze flue gas for proper air/fuel ratio $3,098 $500 - $3,098
-
MMBtu
TOTAL RECOMMENDED $7,328 $2,255 $3,994
48,652
kWh
$3,334
-
MMBtu
TOTAL IMPLEMENTED $6,316 $1,775 $2,982
36,343
kWh
$3,334
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #4 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs