Assessment Year | 1988 |
---|---|
Principal Product | CUSTOM MOLDED PLASTICS |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 100 |
Plant Area |
n/a
|
Annual Production | 5,500,000
pieces
|
Production Hrs. Annual | 5,880
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $229,216 | 2,585,580 |
kWh
|
$0.089 |
Natural Gas | $36,884 | 5,878 |
MMBtu
|
$6.27 |
Fuel Oil #2 | $11,783 | 2,758 |
MMBtu
|
$4.27 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $11,265 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,853 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $870 | $164 |
$870
9,672
kWh
|
- | |
02 | 2.4221: Install compressor air intakes in coolest locations | $417 | $500 |
$417
4,689
kWh
|
- | |
03 | 2.7243: Improve air circulation with destratification fans / other methods | $1,127 | - |
$(-148.0)
(-1,758)
kWh
|
$1,275
-
MMBtu
|
|
04 | 2.2514: Cover open tanks | $410 | $200 | - |
$410
-
MMBtu
|
|
05 | 2.4312: Improve lubrication practices | $1,285 | - |
$1,285
14,361
kWh
|
- | |
06 | 2.6231: Utilize controls to operate equipment only when needed | $1,896 | $1,650 |
$1,896
21,395
kWh
|
- | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,913 | - |
$2,913
32,825
kWh
|
- | |
08 | 2.2136: Install / repair insulation on steam lines | $397 | $130 | - |
$397
-
MMBtu
|
|
09 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,950 | $500 | - |
$1,950
-
MMBtu
|
|
TOTAL RECOMMENDED | $11,265 | $3,144 |
$7,233
81,184
kWh
|
$4,032
-
MMBtu
|
||
TOTAL IMPLEMENTED | $8,853 | $3,144 |
$6,096
68,581
kWh
|
$2,757
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs