| Assessment Year | 2003 |
|---|---|
| Principal Product | Fragrances |
| NAICS | 311999: All Other Miscellaneous Food Manufacturing |
| SIC | 2087: Flavoring Extracts and Flavoring Syrups, Not Elsewhere Classified |
| Sales Range | $50 M to 100M |
| # of Employees | 179 |
| Plant Area |
73,000
ft2
|
| Annual Production | 100,000
pieces
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $116,106 | 3,379,839 |
kWh
|
$0.034 |
| Electricity Demand | $34,805 | 861 |
kW-mo/yr
|
$40.42 |
| Natural Gas | $29,609 | 5,027 |
MMBtu
|
$5.89 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $691,460 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $94,985 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,414 | $8,936 |
$7,913
232,735
kWh
|
$2,501
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.4221: Install compressor air intakes in coolest locations | $4,569 | $2,000 |
$4,569
99,331
kWh
|
- | - | - | - | |
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $51,357 | $165,670 |
$37,701
1,108,858
kWh
|
$13,656
-
kW-mo/yr
|
- | - | - | |
| 04 | 2.4133: Use most efficient type of electric motors | $84,571 | $191,945 |
$65,923
1,938,915
kWh
|
$18,648
-
kW-mo/yr
|
- | - | - | |
| 05 | 2.2511: Insulate bare equipment | $29,609 | $3,005 | - | - |
$29,609
-
MMBtu
|
- | - | |
| 06 | 3.4111: Use closed cycle process to minimize waste water production | $375,940 | $302,000 | - | - | - |
$375,940
-
Tgal
|
- | |
| 07 | 4.441: Install automatic packing equipment | $135,000 | $32,000 | - | - | - | - | $135,000 | |
| TOTAL RECOMMENDED | $691,460 | $705,556 |
$116,106
3,379,839
kWh
|
$34,805
-
kW-mo/yr
|
$29,609
-
MMBtu
|
$375,940
-
Tgal
|
$135,000 | ||
| TOTAL IMPLEMENTED | $94,985 | $200,881 |
$73,836
2,171,650
kWh
|
$21,149
-
kW-mo/yr
|
- | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | |||