ITAC Assessment: RU0018
ITAC logo
ITAC Assessment: RU0018
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product MIRRORS AND FRAMES
NAICS
n/a
SIC 3231: Glass Products, Made of Purchased Glass
Sales Range $10
M
to 50
M
# of Employees 204
Plant Area
n/a
Annual Production 300,000
pieces
Production Hrs. Annual 2,805
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $47,475 453,107
kWh
Natural Gas $42,286 6,916
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,795 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,499

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $395 $80 $395
3,810
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $985 - $985
9,379
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $322 $202 $322
3,224
kWh
-
04 2.7221: Lower temperature during the winter season and vice-versa $901 - - $901
-
MMBtu
05 2.7261: Install timers and/or thermostats $9,192 $7,170 - $9,192
-
MMBtu
TOTAL RECOMMENDED $11,795 $7,452 $1,702
16,413
kWh
$10,093
-
MMBtu
TOTAL IMPLEMENTED $10,499 $7,372 $1,307
12,603
kWh
$9,192
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs