Assessment Year | 2012 |
---|---|
Principal Product | Reclaimed Water |
NAICS | 221310: Water Supply and Irrigation Systems |
SIC | 4952: Sewerage Systems |
Sales Range | $1 M to 5M |
# of Employees | 33 |
Plant Area |
20,000
ft2
|
Annual Production | 2,500,000
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $385,457 | 7,651,400 |
kWh
|
$0.050 |
Electricity Demand | $228,141 | 12,774 |
kW-mo/yr
|
$17.86 |
Electricity Fees | $7,792 | - |
|
- |
Natural Gas | $39,327 | 4,111 |
MMBtu
|
$9.57 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $198,327 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $36,972 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1336: Install equipment to utilize waste fuel | $35,395 | $14,332 | - | - |
$35,395
-
MMBtu
|
- | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $23,815 | $17,500 |
$16,035
318,160
kWh
|
$7,780
-
kW-mo/yr
|
- | - | |
03 | 2.7132: Install timers on light switches in little used areas | $1,577 | $2,373 |
$1,577
31,300
kWh
|
- | - | - | |
04 | 3.1191: Change procedures / equipment / operating conditions | $3,240 | $9,000 |
$3,240
64,285
kWh
|
- | - | - | |
05 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $134,300 | $455,000 |
$75,600
1,500,000
kWh
|
$35,700
-
kW-mo/yr
|
$38,000
-
MMBtu
|
$(-15,000.0) | |
TOTAL RECOMMENDED | $198,327 | $498,205 |
$96,452
1,913,745
kWh
|
$43,480
-
kW-mo/yr
|
$73,395
-
MMBtu
|
$(-15,000.0) | ||
TOTAL IMPLEMENTED | $36,972 | $16,705 |
$1,577
31,300
kWh
|
- |
$35,395
-
MMBtu
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs