ITAC Assessment: SD0451
ITAC logo
ITAC Assessment: SD0451
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Reclaimed Water
NAICS 221310: Water Supply and Irrigation Systems
SIC 4952: Sewerage Systems
Sales Range $1
M
to 5
M
# of Employees 33
Plant Area 20,000
ft2
Annual Production 2,500,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $385,457 7,651,400
kWh
Electricity Demand $228,141 12,774
kW-mo/yr
Electricity Fees $7,792 -
Natural Gas $39,327 4,111
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $198,327 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,972

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.1336: Install equipment to utilize waste fuel $35,395 $14,332 - - $35,395
-
MMBtu
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $23,815 $17,500 $16,035
318,160
kWh
$7,780
-
kW-mo/yr
- -
03 2.7132: Install timers on light switches in little used areas $1,577 $2,373 $1,577
31,300
kWh
- - -
04 3.1191: Change procedures / equipment / operating conditions $3,240 $9,000 $3,240
64,285
kWh
- - -
05 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $134,300 $455,000 $75,600
1,500,000
kWh
$35,700
-
kW-mo/yr
$38,000
-
MMBtu
$(-15,000.0)
TOTAL RECOMMENDED $198,327 $498,205 $96,452
1,913,745
kWh
$43,480
-
kW-mo/yr
$73,395
-
MMBtu
$(-15,000.0)
TOTAL IMPLEMENTED $36,972 $16,705 $1,577
31,300
kWh
- $35,395
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs