ITAC Assessment: RU0015
ITAC logo
ITAC Assessment: RU0015
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product PVC PIPE EXTRUSIONS
NAICS
n/a
SIC 3084: Plastics Pipe
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area
n/a
Annual Production 12,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $266,800 4,099,941
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,937 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,041

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,704 - $2,704
41,618
kWh
02 2.4221: Install compressor air intakes in coolest locations $358 $96 $358
5,569
kWh
03 2.2511: Insulate bare equipment $2,412 $130 $2,412
37,222
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $531 $368 $531
8,206
kWh
05 2.7492: Use proper thickness of insulation on building envelope $1,538 $3,132 $1,538
23,740
kWh
06 2.7447: Install vinyl strip / high speed / air curtain doors $3,394 $800 $3,394
52,169
kWh
TOTAL RECOMMENDED $10,937 $4,526 $10,937
168,524
kWh
TOTAL IMPLEMENTED $9,041 $1,298 $9,041
139,215
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs