ITAC Assessment: BS0100
ITAC logo
ITAC Assessment: BS0100
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Trailers
NAICS 336212: Truck Trailer Manufacturing
SIC 3715: Truck Trailers
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 566,280
ft2
Annual Production 350
pieces
Production Hrs. Annual 2,600
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $46,730 759,298
kWh
Electricity Demand $23,979 4,890
kW-mo/yr
Electricity Fees $1,012 -
Natural Gas $33,478 5,186
MMBtu
LPG $5,634 100
MMBtu
Waste Disposal Costs
Gaseous Waste $10,922 75,360
lb
TOTAL YEARLY COSTS $121,755
RECOMMENDED SAVINGS* $12,424 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,619 $437 $1,619
26,308
kWh
- -
02 3.1161: Eliminate/reduce an operation $247 $89 $247
4,007
kWh
- -
03 2.4221: Install compressor air intakes in coolest locations $703 $90 $517
8,399
kWh
$186
-
kW-mo/yr
-
04 2.7135: Install occupancy sensors $284 $39 $284
4,619
kWh
- -
05 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $640 $8 $640
10,400
kWh
- -
06 2.4322: Use or replace with energy efficient substitutes $80 $100 $36
582
kWh
$44
-
kW-mo/yr
-
07 2.4322: Use or replace with energy efficient substitutes $4,572 $14,699 $(-1,440.0)
(-23,400)
kWh
- $6,012
-
MMBtu
08 2.2437: Recover waste heat from equipment $488 $564 $(-122.0)
(-1,981)
kWh
- $610
-
MMBtu
09 2.7142: Utilize higher efficiency lamps and/or ballasts $3,791 $16,366 $2,693
43,758
kWh
$1,098
-
kW-mo/yr
-
TOTAL RECOMMENDED $12,424 $32,392 $4,474
72,692
kWh
$1,328
-
kW-mo/yr
$6,622
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs