| Assessment Year | 2017 |
|---|---|
| Principal Product | Trailers |
| NAICS | 336212: Truck Trailer Manufacturing |
| SIC | 3715: Truck Trailers |
| Sales Range | $10 M to 50M |
| # of Employees | 70 |
| Plant Area |
566,280
ft2
|
| Annual Production | 350
pieces
|
| Production Hrs. Annual | 2,600
hrs
|
| Location (State) | Idaho |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $46,730 | 759,298 |
kWh
|
$0.062 | |
| Electricity Demand | $23,979 | 4,890 |
kW-mo/yr
|
$4.90 | |
| Electricity Fees | $1,012 | - |
|
- | |
| Natural Gas | $33,478 | 5,186 |
MMBtu
|
$6.46 | |
| LPG | $5,634 | 100 |
MMBtu
|
$56.34 | |
| Waste Disposal Costs | |||||
| Gaseous Waste | $10,922 | 75,360 |
lb
|
$0.14 | |
| TOTAL YEARLY COSTS | $121,755 | ||||
| RECOMMENDED SAVINGS* | $12,424 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,619 | $437 |
$1,619
26,308
kWh
|
- | - | |
| 02 | 3.1161: Eliminate/reduce an operation | $247 | $89 |
$247
4,007
kWh
|
- | - | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $703 | $90 |
$517
8,399
kWh
|
$186
-
kW-mo/yr
|
- | |
| 04 | 2.7135: Install occupancy sensors | $284 | $39 |
$284
4,619
kWh
|
- | - | |
| 05 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $640 | $8 |
$640
10,400
kWh
|
- | - | |
| 06 | 2.4322: Use or replace with energy efficient substitutes | $80 | $100 |
$36
582
kWh
|
$44
-
kW-mo/yr
|
- | |
| 07 | 2.4322: Use or replace with energy efficient substitutes | $4,572 | $14,699 |
$(-1,440.0)
(-23,400)
kWh
|
- |
$6,012
-
MMBtu
|
|
| 08 | 2.2437: Recover waste heat from equipment | $488 | $564 |
$(-122.0)
(-1,981)
kWh
|
- |
$610
-
MMBtu
|
|
| 09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,791 | $16,366 |
$2,693
43,758
kWh
|
$1,098
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $12,424 | $32,392 |
$4,474
72,692
kWh
|
$1,328
-
kW-mo/yr
|
$6,622
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs