ITAC Assessment: RU0012
ITAC logo
ITAC Assessment: RU0012
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product PLASTIC & METAL FABRICTN
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 37
Plant Area
n/a
Annual Production 2,000,000
lb
Production Hrs. Annual 2,080
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $122,365 1,250,293
kWh
Natural Gas $19,784 3,061
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,494 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,926

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $302 $600 $302
3,224
kWh
-
02 2.7243: Improve air circulation with destratification fans / other methods $3,052 $3,750 - $3,052
-
MMBtu
03 2.6212: Turn off equipment during breaks, reduce operating time $568 - $568
5,862
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $213 $82 $213
2,052
kWh
-
05 2.7261: Install timers and/or thermostats $5,664 $2,800 - $5,664
-
MMBtu
06 2.7245: Use direct air supply to exhaust hoods $695 $710 $413
4,103
kWh
$282
-
MMBtu
TOTAL RECOMMENDED $10,494 $7,942 $1,496
15,241
kWh
$8,998
-
MMBtu
TOTAL IMPLEMENTED $9,926 $7,942 $928
9,379
kWh
$8,998
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs