ITAC Assessment: KU0544
ITAC logo
ITAC Assessment: KU0544
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product wooden cabinets
NAICS
n/a
SIC 2434: Wood Kitchen Cabinets
Sales Range $10
M
to 50
M
# of Employees 280
Plant Area 230,000
ft2
Annual Production 4,951
ton
Production Hrs. Annual 2,340
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $172,578 3,342,614
kWh
Electricity Demand $55,330 12,600
kW-mo/yr
Natural Gas $1,462 2,156
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,620 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,900

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7124: Make a practice of turning off lights when not needed $3,310 $800 $1,900
49,824
kWh
$1,210
-
kW-mo/yr
$200 -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,390 $840 $1,080
28,429
kWh
$1,310
-
kW-mo/yr
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,020 $920 $460
12,309
kWh
$560
-
kW-mo/yr
- -
04 2.4221: Install compressor air intakes in coolest locations $680 $280 $310
7,913
kWh
$370
-
kW-mo/yr
- -
05 4.445: Install equipment to move product $31,200 $2,780 - - $31,200 -
06 4.131: Modify process to reduce material use/cost $1,020 $500 - - - $1,020
TOTAL RECOMMENDED $39,620 $6,120 $3,750
98,475
kWh
$3,450
-
kW-mo/yr
$31,400 $1,020
TOTAL IMPLEMENTED $36,900 $4,420 $2,980
78,253
kWh
$2,520
-
kW-mo/yr
$31,400 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs