Assessment Year | 2022 |
---|---|
Principal Product | Printed Circuit Boards |
NAICS | 334418: Printed Circuit Assembly (Electronic Assembly) Manufacturing |
SIC | 3679: Electronic Components, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 155 |
Plant Area |
92,000
ft2
|
Annual Production | 250,000
units
|
Production Hrs. Annual | 2,400
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $136,235 | 1,121,881 |
kWh
|
$0.12 |
Electricity Demand | $29,523 | 4,238 |
kW-mo/yr
|
$6.97 |
Electricity Fees | $8,899 | - |
|
- |
Natural Gas | $13,452 | 1,352 |
MMBtu
|
$9.95 |
TOTAL YEARLY COSTS | $188,109 | |||
RECOMMENDED SAVINGS* | $24,329 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $12,750 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.6218: Turn off equipment when not in use | $1,561 | - |
$1,561
10,544
kWh
|
- | |
02 | 2.2211: Use optimum temperature | $309 | - |
$309
2,090
kWh
|
- | |
03 | 2.4224: Upgrade controls on compressors | $4,027 | $31,018 |
$4,027
27,209
kWh
|
- | |
04 | 2.6218: Turn off equipment when not in use | $179 | - |
$179
1,212
kWh
|
- | |
05 | 2.6231: Utilize controls to operate equipment only when needed | $6,224 | - |
$6,224
42,052
kWh
|
- | |
06 | 2.7261: Install timers and/or thermostats | $1,119 | $145 |
$347
2,346
kWh
|
$772
-
MMBtu
|
|
07 | 2.7124: Make a practice of turning off lights when not needed | $567 | - |
$567
3,828
kWh
|
- | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $88 | $117 |
$88
596
kWh
|
- | |
09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $508 | $1,000 |
$508
3,429
kWh
|
- | |
10 | 2.7313: Recycle air for heating, ventilation and air conditioning | $1,239 | $3,000 |
$135
912
kWh
|
$1,104
-
MMBtu
|
|
11 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,145 | $39 |
$3,145
21,250
kWh
|
- | |
12 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,363 | $3,109 |
$5,363
36,236
kWh
|
- | |
TOTAL RECOMMENDED | $24,329 | $38,428 |
$22,453
151,704
kWh
|
$1,876
-
MMBtu
|
||
TOTAL IMPLEMENTED | $12,750 | $4,226 |
$12,750
86,141
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs