ITAC Assessment: DL0203
ITAC logo
ITAC Assessment: DL0203
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Printed Circuit Boards
NAICS 334418: Printed Circuit Assembly (Electronic Assembly) Manufacturing
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 155
Plant Area 92,000
ft2
Annual Production 250,000
units
Production Hrs. Annual 2,400
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $136,235 1,121,881
kWh
Electricity Demand $29,523 4,238
kW-mo/yr
Electricity Fees $8,899 -
Natural Gas $13,452 1,352
MMBtu
TOTAL YEARLY COSTS $188,109
RECOMMENDED SAVINGS* $24,329 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,750

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6218: Turn off equipment when not in use $1,561 - $1,561
10,544
kWh
-
02 2.2211: Use optimum temperature $309 - $309
2,090
kWh
-
03 2.4224: Upgrade controls on compressors $4,027 $31,018 $4,027
27,209
kWh
-
04 2.6218: Turn off equipment when not in use $179 - $179
1,212
kWh
-
05 2.6231: Utilize controls to operate equipment only when needed $6,224 - $6,224
42,052
kWh
-
06 2.7261: Install timers and/or thermostats $1,119 $145 $347
2,346
kWh
$772
-
MMBtu
07 2.7124: Make a practice of turning off lights when not needed $567 - $567
3,828
kWh
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $88 $117 $88
596
kWh
-
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $508 $1,000 $508
3,429
kWh
-
10 2.7313: Recycle air for heating, ventilation and air conditioning $1,239 $3,000 $135
912
kWh
$1,104
-
MMBtu
11 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,145 $39 $3,145
21,250
kWh
-
12 2.7142: Utilize higher efficiency lamps and/or ballasts $5,363 $3,109 $5,363
36,236
kWh
-
TOTAL RECOMMENDED $24,329 $38,428 $22,453
151,704
kWh
$1,876
-
MMBtu
TOTAL IMPLEMENTED $12,750 $4,226 $12,750
86,141
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs