ITAC Assessment: OR0026
ITAC logo
ITAC Assessment: OR0026
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product LASER TRIMMER SYSTEMS
NAICS
n/a
SIC 3699: Electrical Machinery, Equipment, and Supplies, Not Elsewhere
Sales Range $10
M
to 50
M
# of Employees 540
Plant Area
n/a
Annual Production 80
pieces
Production Hrs. Annual 2,100
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $216,711 4,162,661
kWh
Natural Gas $2,315 408
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,947 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $31,958

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.6232: Install set-back timers $1,607 - $1,607
27,550
kWh
- -
02 2.7261: Install timers and/or thermostats $28,590 $1,000 $27,154
522,274
kWh
$1,436
-
MMBtu
-
03 2.4221: Install compressor air intakes in coolest locations $382 $100 $382
7,327
kWh
- -
04 2.2511: Insulate bare equipment $2,666 $3,230 $2,666
51,290
kWh
- -
05 3.4115: Recover and reuse cooling water $702 $2,050 - - $702
TOTAL RECOMMENDED $33,947 $6,380 $31,809
608,441
kWh
$1,436
-
MMBtu
$702
TOTAL IMPLEMENTED $31,958 $6,280 $29,820
573,564
kWh
$1,436
-
MMBtu
$702
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs