ITAC Assessment: OK0962
ITAC logo
ITAC Assessment: OK0962
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Aerospace machining
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3364: Nonferrous Die-Castings, Except Aluminum
Sales Range $5
M
to 10
M
# of Employees 38
Plant Area 24,000
ft2
Annual Production 40,000
units
Production Hrs. Annual 7,200
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $47,067 687,320
kWh
Electricity Demand $10,809 1,858
kW-mo/yr
Electricity Fees $21,048 -
Natural Gas $2,851 399
MMBtu
Waste Disposal Costs
Water Usage $2,362 131
Tgal
TOTAL YEARLY COSTS $84,137
RECOMMENDED SAVINGS* $18,585 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,284

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7241: Install outside air damper / economizer on hvac unit $6,242 $3,615 $6,242
91,793
kWh
- - -
02 2.2622: Replace existing chiller with high efficiency model $1,799 $6,750 $1,082
15,914
kWh
$717
-
kW-mo/yr
- -
03 2.7211: Clean and maintain refrigerant condensers and towers $600 $160 $437
6,420
kWh
$163
-
kW-mo/yr
- -
04 2.6232: Install set-back timers $378 $599 $286
4,204
kWh
- - $92
-
MMBtu
05 2.6127: Maintain air filters by cleaning or replacement $311 $480 $311
4,580
kWh
- - -
06 2.7447: Install vinyl strip / high speed / air curtain doors $304 $90 $73
1,067
kWh
- - $232
-
MMBtu
07 2.4322: Use or replace with energy efficient substitutes $2,765 $1,260 $2,765
40,660
kWh
- - -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,622 $680 $1,622
23,847
kWh
- - -
09 2.4231: Reduce the pressure of compressed air to the minimum required $712 $2,381 $712
10,469
kWh
- - -
10 2.4221: Install compressor air intakes in coolest locations $487 $1,180 $487
7,157
kWh
- - -
11 2.7142: Utilize higher efficiency lamps and/or ballasts $2,547 $7,040 $2,240
32,947
kWh
$307
-
kW-mo/yr
- -
12 2.7142: Utilize higher efficiency lamps and/or ballasts $264 $1,120 $264
3,875
kWh
- - -
13 2.8123: Pay utility bills on time $554 - - - $554 -
TOTAL RECOMMENDED $18,585 $25,355 $16,520
242,933
kWh
$1,187
-
kW-mo/yr
$554 $324
-
MMBtu
TOTAL IMPLEMENTED $9,284 $8,415 $8,474
124,623
kWh
$163
-
kW-mo/yr
$554 $92
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs